Unit prices - backup calculations, Devil Canyon, arch dam concrete.
A collection of hand-completed worksheets (called 'Calculations' or 'Estimate work sheet') from Acres American Incorporated regarding estimated costs for the Susitna Hydroelectric Project.
Saved in:
Alternate Title: | Book D. Unit prices - backup calculations, Devil Canyon, arch dam concrete. D). Unit prices - backup calculations, Devil Canyon, arch dam concrete |
---|---|
Corporate Contributor(s): | Acres American Incorporated. HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Acres American Incorporated ; [Available from] Acres Consulting Services, |
Report Numbers: | APA 104 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 104. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02921cam a2200541Ia 4500 | ||
---|---|---|---|
001 | 2038581 | ||
003 | SIRSI | ||
005 | 20140523011043.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140520s1982 nyua t 000 0 eng d | ||
040 | |a RLA |c RLA |d RLA | ||
035 | |a (OCoLC)880320408 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 104 | |
088 | |a APA 104 | ||
049 | |a RLAA | ||
130 | 0 | |a Book D. |p Unit prices - backup calculations, Devil Canyon, arch dam concrete. | |
245 | 1 | 0 | |a Unit prices - backup calculations, Devil Canyon, arch dam concrete. |
246 | 3 | |a D). |p Unit prices - backup calculations, Devil Canyon, arch dam concrete | |
260 | |a [Buffallo, N.Y. : |b Acres American Incorporated ; |a Niagara Falls, Ont. : |b [Available from] Acres Consulting Services, |c 1982] | ||
300 | |a 116 [i.e. 105] p. : |b ill. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 104 | |
500 | |a Title from caption and series statement from label on page 1 (table of contents page). | ||
500 | |a At head of title: D). | ||
500 | |a Date ("April 8, 1982"), job number, and issuing body from document transmittal sheet (page 2). | ||
500 | |a This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc. | ||
500 | |a Pages are numbered by hand on the bottom through 116; some pages are missing or not included. Total number of pages is 105. | ||
510 | 3 | |a Assigned APA Document no. 104 in the Susitna Hydroelectric Project document index. | |
536 | |f P5700.09 |f AN-AB28 | ||
530 | |a Available also in electronic format on the Internet. | ||
520 | |a A collection of hand-completed worksheets (called 'Calculations' or 'Estimate work sheet') from Acres American Incorporated regarding estimated costs for the Susitna Hydroelectric Project. | ||
505 | 0 | |a Arch dam concrete summary -- Coarse aggregate -- Fine aggregate -- Cement -- Ice plant -- Concrete production -- Refrigeration -- Heating -- Forming -- Placing concrete -- Joint finishes. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Dams |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Arch dams |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Concrete |x Costs. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 104. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/1/APA104.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 00104 |