Hi-volume air monitoring program. Final report /
Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct with Prevention of Significant Deterioration review to the Alaska Dept. of Environmental Conservation (ADEC). This monitoring program was established to m...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Hi-volume air monitoring program. Final report Hi-volume air monitoring program. Final monitoring and quality assurance report |
---|---|
Corporate Contributor(s): | HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1697 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1697. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03090nam a2200529Ia 4500 | ||
---|---|---|---|
001 | 2035143 | ||
003 | SIRSI | ||
005 | 20140430092250.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140430s1985 akuabd bt s000 0 eng d | ||
040 | |a RLA |c RLA | ||
035 | |a (OCoLC)878685970 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 1697 | |
088 | |a APA 1697 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Hi-volume air monitoring program. |p Final report / |c report by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. |
246 | 3 | |a Susitna Hydroelectric Project. |p Hi-volume air monitoring program. |p Final report | |
246 | 1 | 4 | |a Hi-volume air monitoring program. |p Final monitoring and quality assurance report |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1985] | ||
300 | |a 50 p. in various pagings : |b ill., maps, charts ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Document ; |v no. 1697 | |
500 | |a At head of title: Susitna Hydroelectric Project. | ||
500 | |a "March 1985." | ||
500 | |a "Federal Energy Regulatory Commission. Project No. 7114"--Cover. | ||
513 | |a Final report. | ||
510 | 3 | |a Assigned APA Document no. 1697 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
505 | 0 | |a Introduction -- Regulatory framework -- Existing and proposed sources of air pollution -- Summary of meteorological data -- Results of the 1984 TSP monitoring program -- Quality assurance program -- Summary and conclusions. | |
520 | |a Air pollutant emissions during construction of the Susitna Hydroelectric Project may be high enough to require submittal of a Permit to Construct with Prevention of Significant Deterioration review to the Alaska Dept. of Environmental Conservation (ADEC). This monitoring program was established to measure baseline values of total suspended particulates (TSP), as such particulates caused by natural windblown dust is the only significant air contaminant at the site. Two sites are monitored: the proposed Watana campsite and another site along the Susitna River over three miles away. This report is the final of three reports written for this program being submitted to ADEC. | ||
504 | |a Includes bibliographical references (p. VIII-1 to VIII-2). | ||
650 | 0 | |a Air quality |z Alaska |z Susitna River Valley. | |
650 | 0 | |a Particles |x Measurement. | |
650 | 0 | |a Hydroelectric power plants |x Design and construction |x Environmental aspects |z Alaska |z Susitna River Valley. | |
650 | 0 | |a Dams |x Design and construction |x Environmental aspects |z Alaska |z Susitna River Valley. | |
651 | 0 | |a Susitna River Valley (Alaska) |x Climate. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1697. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/16/APA1697.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 01697 |