Report, October 6-8, 1981 /
This report contains the entire proceedings of the third External Review Panel Meeting. By comparison, APA Documents 2357 and 2427 contains the final version of the Panel report (though the text is identical) without the full proceeding papers, and APA Document 1380 contains the information package.
Saved in:
Alternate Title: | External Review Board Meeting #3 report, October 6-8, 1981. Alaska Power Authority, Susitna Hydroelectric Project. External Review Board Meeting #3 report, October 6-8, 1981 Susitna Hydroelectric Project. External Review Board Meeting #3, report, October 6-8, 1981 |
---|---|
Corporate Author: | |
Corporate Contributor(s): | HARZA-EBASCO Susitna Joint Venture. Acres American Incorporated. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 2359 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 2359. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | This report contains the entire proceedings of the third External Review Panel Meeting. By comparison, APA Documents 2357 and 2427 contains the final version of the Panel report (though the text is identical) without the full proceeding papers, and APA Document 1380 contains the information package. |
---|---|
Physical Description: | [148] p. : ill., charts, plans ; 28 cm. |
Notes: | The third meeting of the Susitna Hydroelectric Project External Review Panel is called "Board" in this document except in the final paper at the end. "Prepared by Acres American Incorporated"--Cover. At head of title: Alaska Power Authority, Susitna Hydroelectric Project. Series statement from label on cover. Includes a 10-page draft version (with identical text) of the 9-page report: Susitna Hydroelectric Project External Review Panel report no. 3. This list of attendees is useful for identifying the agency or company to which members of the Panel and other participants belong. |