Feasibility report project manual /
The purpose of this project manual is to set forth standard procedures for preparation of text, plates and drawings, editing, proofreading, checking and production of the feasibility report for the Susitna Hydroelectric Project to be issued in February 1982. (The first draft is numbered APA 1291-129...
Saved in:
Alternate Title: | Project manual, Subtask 6.31, Feasibility report |
---|---|
Corporate Contributor(s): | Acres American Incorporated. |
Publisher: | Acres American Incorporated, |
Report Numbers: | APA 1290 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1290. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02337cam a2200433Ia 4500 | ||
---|---|---|---|
001 | 2018550 | ||
003 | SIRSI | ||
005 | 20140214024152.0 | ||
007 | cr bn||||a|||| | ||
008 | 140214s1981 nyuk f 000 0 eng d | ||
035 | |a (OCoLC)870549979 | ||
040 | |a RLA |c RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b A23 no. 1290 | |
088 | |a APA 1290 | ||
245 | 0 | 0 | |a Feasibility report project manual / |c Acres American Incorporated. |
246 | 1 | 6 | |a Project manual, Subtask 6.31, Feasibility report |
260 | |a Buffalo, N.Y. : |b Acres American Incorporated, |c [1981] | ||
300 | |a [93] p. : |b forms ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a "December 21, 1981." | ||
510 | 3 | |a Assigned APA Document no. 1290 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a The purpose of this project manual is to set forth standard procedures for preparation of text, plates and drawings, editing, proofreading, checking and production of the feasibility report for the Susitna Hydroelectric Project to be issued in February 1982. (The first draft is numbered APA 1291-1292.) The manual also includes a schedule for preparation of the report and an outline of the contents. | ||
505 | 0 | |a Introduction -- Components of feasibility report -- Schedule -- Responsibilities -- Distribution -- Figures and plates -- Text -- Appendices -- Reproduction. | |
650 | 0 | |a Dams |x Research |z Alaska |z Susitna River |x Methodology |v Handbooks, manuals, etc. | |
650 | 0 | |a Technical writing |v Handbooks, manuals, etc. | |
650 | 0 | |a Hydroelectric power plants |x Research |z Alaska |z Susitna River |x Methodology |v Handbooks, manuals, etc. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Research |x Methodology. |
710 | 2 | |a Acres American Incorporated. | |
787 | 0 | 8 | |i Project manual for: |t Feasibility report. Volume 1, Engineering and economic aspects. |b 1st draft. |d [Anchorage, Alaska] : Alaska Power Authority, [1982] |r APA 1291-1292 |w (OCoLC)869298757 |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1290. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/12/APA1290.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 01290 |