Task 6, design development. Subtask 6.02, Closeout report, investigate tunnel alternative.

"The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelectric power on the Susitna River between the proposed Watana and Devil Canyon dam sites."--P. 1-1.

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.02, Closeout report, investigate tunnel alternative

Subtask 6.02, Closeout report, investigate tunnel alternative

Investigate tunnel alternative
Corporate Contributor(s):Alaska Power Authority.

Acres American Incorporated.
Publisher:Acres American Incorporated,
Report Numbers:APA 1279
Edition:Final draft.
Series:Document (Susitna Hydroelectric Project) ; no. 1279.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02467cam a2200481Ia 4500
001 2018513
003 SIRSI
005 20140214104822.0
007 cr bn||||a||||
008 140214s1981 nyuab bt 000 0 eng d
035 |a (OCoLC)870539742 
040 |a RLA  |c RLA  |d RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b A23 no. 1279 
088 |a APA 1279 
245 0 0 |a Task 6, design development.  |n Subtask 6.02,  |p Closeout report, investigate tunnel alternative. 
246 3 |a Alaska Power Authority, Susitna Hydroelectric Project.  |n Task 6,  |p Design development.  |n Subtask 6.02,  |p Closeout report, investigate tunnel alternative 
246 3 0 |a Subtask 6.02,  |p Closeout report, investigate tunnel alternative 
246 3 0 |a Investigate tunnel alternative 
250 |a Final draft. 
260 |a Buffalo, N.Y. :  |b Acres American Incorporated,  |c [1981] 
300 |a 74 p. in various pagings :  |b ill., maps ;  |c 28 cm. 
336 |a text  |2 rdacontent 
337 |a computer  |2 rdamedia 
338 |a online resource  |2 rdacarrier 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a "March 1981." 
510 3 |a Assigned APA Document no. 1279 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
520 |a "The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelectric power on the Susitna River between the proposed Watana and Devil Canyon dam sites."--P. 1-1. 
505 0 |a Introduction -- Summary -- Scope of work -- Conceptual tunnel schemes -- Tunnel design and construction considerations -- Screening of conceptual tunnel schemes -- Preferred tunnel scheme -- Comparison with Devil Canyon dam scheme -- Conclusions and recommendations. 
504 |a Includes bibliographical references. 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Water tunnels  |z Alaska  |z Susitna River Valley  |x Design and construction. 
650 0 |a Underground electric power plants  |z Alaska  |z Susitna River Valley  |x Design and construction. 
710 2 |a Alaska Power Authority. 
710 2 |a Acres American Incorporated. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1279. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/12/APA1279.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 01279