Task 6, design development. Subtask 6.02, Closeout report, investigate tunnel alternative.
"The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelectric power on the Susitna River between the proposed Watana and Devil Canyon dam sites."--P. 1-1.
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.02, Closeout report, investigate tunnel alternative Subtask 6.02, Closeout report, investigate tunnel alternative Investigate tunnel alternative |
---|---|
Corporate Contributor(s): | Alaska Power Authority. Acres American Incorporated. |
Publisher: | Acres American Incorporated, |
Report Numbers: | APA 1279 |
Edition: | Final draft. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1279. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | "The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelectric power on the Susitna River between the proposed Watana and Devil Canyon dam sites."--P. 1-1. |
---|---|
Physical Description: | 74 p. in various pagings : ill., maps ; 28 cm. |
Notes: | At head of title: Alaska Power Authority, Susitna Hydroelectric Project. "March 1981." |
Bibliography: | Includes bibliographical references. |