Alaska Power Authority response to Federal Energy Regulatory Commission data request of October 24, 1984 /
Saved in:
Corporate Contributor(s): | United States. Federal Energy Regulatory Commission. Alaska Power Authority. Susitna Hydroelectric Project. HARZA-EBASCO Susitna Joint Venture. |
---|---|
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 2509 APA 2510 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 2509-2510. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03257cam a2200589Ia 4500 | ||
---|---|---|---|
001 | 2018501 | ||
003 | SIRSI | ||
005 | 20160428081105.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140214s1984 akua t s000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d RLA |d OCLCO |d OCLCQ |d RLA | ||
035 | |a (OCoLC)870537192 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b F472 no. 2509-2510 | |
088 | |a APA 2509 | ||
088 | |a APA 2510 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Alaska Power Authority response to Federal Energy Regulatory Commission data request of October 24, 1984 / |c Harza-Ebasco Susitna Joint Venture. |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1984] | ||
300 | |a 2 volumes : |b illustrations ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 2509-2510 | |
500 | |a Cover title. | ||
500 | |a "Susitna Hydroelectric Project. Federal Energy Regulatory Commission Project No. 7114." | ||
500 | |a "November 13, 1984." | ||
500 | |a Series statement from label on cover. | ||
510 | 3 | |a Assigned APA Document numbers 2509-2510 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
500 | |a On October 24, 1984 the Federal Energy Regulatory Commission requested the reference forecast model and the input data and output results for the DGP-6 runs. This document is the Alaska Power Authority's response. The model, which is described in the user's manual (see document APA 2516), is run using a computer program call Optimized Generation Planning written by General Electric Company. It is being used for cost comparisions of the Susitna Hydroelectric Project. The model had been updated since this response (see document APA 2608). | ||
505 | 0 | 0 | |g v. 1. |t Response. |g (APA 2509) -- v. 2. |t Appendix 1, OGP-6 output. |g (APA 2510). |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Design and construction |x Costs. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Design and construction |x Costs. | |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Cost of operation. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Cost of operation. | |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Computer simulation. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Computer simulation. | |
650 | 0 | |a Electric power production |z Alaska |x Computer simulation. | |
650 | 0 | |a Electric power production |z Alaska |x Costs |x Computer simulation. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Data processing. |
710 | 1 | |a United States. |b Federal Energy Regulatory Commission. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 2509-2510. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/25/APA2509.pdf |3 Direct link to the first volume (Response). |z ARLIS Document Server |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/25/APA2509.html |3 List of all volumes. |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a APA 02509 | ||
098 | |a APA 02510 |