Alaska Power Authority response to Federal Energy Regulatory Commission data request of October 24, 1984 /

Saved in:
Bibliographic Details
Corporate Contributor(s):United States. Federal Energy Regulatory Commission.

Alaska Power Authority.

Susitna Hydroelectric Project.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alaska Power Authority,
Report Numbers:APA 2509

APA 2510
Series:Document (Susitna Hydroelectric Project) ; no. 2509-2510.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 03257cam a2200589Ia 4500
001 2018501
003 SIRSI
005 20160428081105.0
007 ta
007 cr bn||||a||||
008 140214s1984 akua t s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d RLA  |d OCLCO  |d OCLCQ  |d RLA 
035 |a (OCoLC)870537192 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b F472 no. 2509-2510 
088 |a APA 2509 
088 |a APA 2510 
049 |a RLAA 
245 0 0 |a Alaska Power Authority response to Federal Energy Regulatory Commission data request of October 24, 1984 /  |c Harza-Ebasco Susitna Joint Venture. 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1984] 
300 |a 2 volumes :  |b illustrations ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 2509-2510 
500 |a Cover title. 
500 |a "Susitna Hydroelectric Project. Federal Energy Regulatory Commission Project No. 7114." 
500 |a "November 13, 1984." 
500 |a Series statement from label on cover. 
510 3 |a Assigned APA Document numbers 2509-2510 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
500 |a On October 24, 1984 the Federal Energy Regulatory Commission requested the reference forecast model and the input data and output results for the DGP-6 runs. This document is the Alaska Power Authority's response. The model, which is described in the user's manual (see document APA 2516), is run using a computer program call Optimized Generation Planning written by General Electric Company. It is being used for cost comparisions of the Susitna Hydroelectric Project. The model had been updated since this response (see document APA 2608). 
505 0 0 |g v. 1.  |t Response.  |g (APA 2509) -- v. 2.  |t Appendix 1, OGP-6 output.  |g (APA 2510). 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Design and construction  |x Costs. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Design and construction  |x Costs. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Cost of operation. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Cost of operation. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Computer simulation. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Computer simulation. 
650 0 |a Electric power production  |z Alaska  |x Computer simulation. 
650 0 |a Electric power production  |z Alaska  |x Costs  |x Computer simulation. 
610 2 0 |a Susitna Hydroelectric Project  |x Data processing. 
710 1 |a United States.  |b Federal Energy Regulatory Commission. 
710 2 |a Alaska Power Authority. 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 2509-2510. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/25/APA2509.pdf  |3 Direct link to the first volume (Response).  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/25/APA2509.html  |3 List of all volumes.  |z ARLIS Document Server 
596 |a 9 10 
098 |a APA 02509 