Eulachon run timing, distribution, and spawning in the Susitna River, Study plan Section 9.16, Final study plan /

The goal of the study is to collect baseline information regarding eulachon run timing, distribution, and habitat use in the Susitna River in 2013 and 2014.

Saved in:
Bibliographic Details
Alternate Title:Final study plan.

Final study plan. Eulachon run timing, distribution, and spawning in the Susitna River 9.16
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 200
Series:Susitna-Watana Hydroelectric Project document ; no. 200.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 02444cam a2200505Ia 4500
001 2018369
007 ta
003 SIRSI
005 20140212011208.0
007 cr cn||||a||||
008 140212s2013 akub b s000 0 eng d
035 |a (OCoLC)870340720 
040 |a RLA  |c RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b S92 no. 200 
088 |a SuWa 200 
110 2 |a Alaska Energy Authority. 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2013] 
240 1 0 |a Final study plan.  |n Study plan Section 9.16,  |p Eulachon run timing, distribution, and spawning in the Susitna River 
245 1 0 |a Eulachon run timing, distribution, and spawning in the Susitna River, Study plan Section 9.16, Final study plan /  |c Alaska Energy Authority. 
246 1 7 |a Final study plan.  |p Eulachon run timing, distribution, and spawning in the Susitna River 9.16 
300 |a 18 p. :  |b 2 col. maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 200 
500 |a "July 2013." 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a ARLIS assigned report number: SuWa 200. 
513 |a Final study plan. 
510 3 |a Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan. 
530 |a Available also in electronic format on the Internet. 
520 |a The goal of the study is to collect baseline information regarding eulachon run timing, distribution, and habitat use in the Susitna River in 2013 and 2014. 
504 |a Includes bibliographical references (p. 9.16-12 to 9.16-13). 
650 0 |a Thaleichthys pacificus  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Thaleichthys pacificus  |x Migration  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Thaleichthys pacificus  |x Counting  |z Alaska  |z Susitna River. 
710 2 |a Susitna-Watana Hydroelectric Project. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 200. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200sec9-16.pdf  |3 Direct link to this section.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200.html  |3 List of related Final Study Plans.  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a SuWa 00200