Air quality study, Study plan Section 15.9, Final study plan /
The primary goal and objective of this study is to ensure that the proposed Project does not violate National Ambient Air Quality Standards and state air quality standards in Alaska Administrative Code. The study area will include not only the immediate Project area, but also the Railbelt region.
Saved in:
Alternate Title: | Final study plan. Final study plan. Air quality study 15.9 |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 200 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 200. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02414cam a2200493Ia 4500 | ||
---|---|---|---|
001 | 2017079 | ||
003 | SIRSI | ||
005 | 20150216165107.0 | ||
007 | ta | ||
007 | cr cn||a|||||| | ||
008 | 140204s2013 aku bt s000 0 eng d | ||
040 | |a RLA |c RLA |d RLA |d OCLCO |d RLA | ||
035 | |a (OCoLC)869838129 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S92 no. 200 sec. 15.9 | |
088 | |a SuWa 200 | ||
110 | 2 | |a Alaska Energy Authority. | |
240 | 1 | 0 | |a Final study plan. |n Study plan Section 15.9, |p Air quality study |
245 | 1 | 0 | |a Air quality study, Study plan Section 15.9, Final study plan / |c Alaska Energy Authority. |
246 | 1 | 7 | |a Final study plan. |p Air quality study 15.9 |
260 | |a [Anchorage : |b Alaska Energy Authority, |c 2013] | ||
300 | |a 7 p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 200 | |
500 | |a "July 2013." | ||
500 | |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." | ||
500 | |a ARLIS assigned report number: SuWa 200. | ||
513 | |a Final study plan. | ||
510 | 3 | |a Listed in January 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Final study plan. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a The primary goal and objective of this study is to ensure that the proposed Project does not violate National Ambient Air Quality Standards and state air quality standards in Alaska Administrative Code. The study area will include not only the immediate Project area, but also the Railbelt region. | ||
504 | |a Includes bibliographical references (page "15.9-5"). | ||
650 | 0 | |a Air quality |x Research |z Alaska | |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |x Research |z Alaska . | |
650 | 0 | |a Dams |x Environmental aspects |x Research |z Alaska. | |
610 | 2 | 0 | |a Susitna-Watana Hydroelectric Project |x Research. |
596 | |a 9 10 | ||
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 200. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200sec15-9.pdf |3 Direct link to this document. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/FSP/SuWa200.html |3 List of related Final Study Plans. |z ARLIS Document Server |
098 | |a SuWa 00200 |