Air quality study, Study plan Section 15.9, Final study plan /
The primary goal and objective of this study is to ensure that the proposed Project does not violate National Ambient Air Quality Standards and state air quality standards in Alaska Administrative Code. The study area will include not only the immediate Project area, but also the Railbelt region.
Saved in:
Alternate Title: | Final study plan. Final study plan. Air quality study 15.9 |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 200 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 200. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | The primary goal and objective of this study is to ensure that the proposed Project does not violate National Ambient Air Quality Standards and state air quality standards in Alaska Administrative Code. The study area will include not only the immediate Project area, but also the Railbelt region. |
---|---|
Physical Description: | 7 p. ; 28 cm. |
Notes: | "July 2013." "Susitna-Watana Hydroelectric Project (FERC No. 14241)." ARLIS assigned report number: SuWa 200. |
Report Type: | Final study plan. |
Bibliography: | Includes bibliographical references (page "15.9-5"). |