Plan of study - revision 2 /
Describes research in various areas (hydrology, seismicity, design, environment, etc.) that is being planned for determining the feasibility of the Susitna Hydroelectric Project.
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Plan of study - revision 2 Alaska Power Authority, Susitna Hydroelectric Project. Plan of study - revision 2 |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1398 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1398. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | Describes research in various areas (hydrology, seismicity, design, environment, etc.) that is being planned for determining the feasibility of the Susitna Hydroelectric Project. |
---|---|
Physical Description: | 37 p. ; 28 cm. |
Notes: | At head of title: Alaska Power Authority, Susitna Hydroelectric Project. "Prepared by Acres"--Cover. "Attachment A.3, Amendment No. 2." "December 1, 1981." Series statement from label on cover. This document contains the second set of revisions to (but does not replace) the earlier revised draft of the study plan for the Susitna Hydroelectric Project titled: Revised draft, Plan of study. 2 vols. January 1980. |
Related Titles: | Supplement to: Revised draft, Plan of study. Columbia, Md. : Acres American Incorporated, [1980] APA 1395-1396 |