Unit prices - backup calculations, Watana Dam, development of unit costs.

A collection of hand-completed worksheets (called 'Calculations') with a few added tables and drawings from Acres American Incorporated regarding estimated costs for the Susitna Hydroelectric Project. These sheets cover rock excavation, cofferdams, rip-rap, overburden removal, gravel pit,...

Full description

Saved in:
Bibliographic Details
Alternate Title:Book B. Unit prices - backup calculations, Watana Dam, development of unit costs.

(B). Unit prices - backup calculations, Watana Dam, development of unit costs

Title in the Susitna Hydroelectric Project document index: Book B. Unit price - back-up calculations, Watana Dam - development of unit costs
Corporate Contributor(s):Acres American Incorporated.
Publisher:Acres American Incorporated,
Report Numbers:APA 98
Series:Document (Susitna Hydroelectric Project) ; no. 98.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02710cam a2200469Ia 4500
001 1991585
003 SIRSI
005 20140523011043.0
007 ta
007 cr bn||||a||||
008 131230s1982 nyua t 000 0 eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)866905783 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 98 
088 |a APA 98 
049 |a RLAA 
130 0 |a Book B.  |p Unit prices - backup calculations, Watana Dam, development of unit costs. 
245 1 0 |a Unit prices - backup calculations, Watana Dam, development of unit costs. 
246 3 |a (B).  |p Unit prices - backup calculations, Watana Dam, development of unit costs 
246 1 |i Title in the Susitna Hydroelectric Project document index:  |a Book B.  |p Unit price - back-up calculations, Watana Dam - development of unit costs 
260 |a [Buffalo, N.Y.? :  |b Acres American Incorporated,  |c 1982] 
300 |a 249 [i.e. 231] p. :  |b ill. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a Chiefly handwritten calculation sheets. 
500 |a At head of title: (B). 
500 |a This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc. 
500 |a Pages are numbered by hand on the bottom through 249 and on top through 229. Total number of pages is 231. 
510 3 |a Assigned APA Document no. 98 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
520 |a A collection of hand-completed worksheets (called 'Calculations') with a few added tables and drawings from Acres American Incorporated regarding estimated costs for the Susitna Hydroelectric Project. These sheets cover rock excavation, cofferdams, rip-rap, overburden removal, gravel pit, concrete aggragate, downstream fill process, impervious fill, protective layer, rock surface preparation, drainage blanket, spillway excavation, river channel excavation, haul roads, dewatering, and construction wage rates. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
650 0 |a Dams  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
710 2 |a Acres American Incorporated. 
650 0 |a Hydroelectric power plants  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 98. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/0/APA98.pdf  |z Size: 28 MB.  |z ARLIS Document Server 