Design transmittal, Task 2, Analysis of alternative transportation for camp resupply /
An analysis of alternative airfields to be used to supply a camp at the Watana dam site during construction of the Susitna Hydroelectric Project. Options include large and light aircraft and helicopters.
Saved in:
Alternate Title: | Task 2, Analysis of alternative transportation for camp resupply. Alaska Power Authority, Susitna Hydroelectric Project. Design transmittal, Task 2, Analysis of alternative transportation for camp resupply Analysis of alternative transportation for camp resupply |
---|---|
Main Author: | |
Corporate Contributor(s): | Susitna Hydroelectric Project. Acres American Incorporated. Alaska Power Authority. |
Publisher: | [Acres American Incorporated], |
Report Numbers: | APA 1218 |
Edition: | [February 1980 ed.]. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1218. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02515cam a2200529Ia 4500 | ||
---|---|---|---|
001 | 1991289 | ||
003 | SIRSI | ||
005 | 20140317093506.0 | ||
007 | cr bn||||a|||| | ||
008 | 131220s1980 nyu 000 0 eng d | ||
035 | |a (OCoLC)865781594 | ||
040 | |a RLA |c RLA |d RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b A23 no. 1218 | |
088 | |a APA 1218 | ||
100 | 1 | |a Debelius, C. A. | |
240 | 1 | 0 | |a Task 2, Analysis of alternative transportation for camp resupply. |p Design transmittal |
245 | 1 | 0 | |a Design transmittal, Task 2, Analysis of alternative transportation for camp resupply / |c prepared by C.A. Debelius. |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |p Design transmittal, Task 2, Analysis of alternative transportation for camp resupply | |
246 | 3 | 0 | |a Analysis of alternative transportation for camp resupply |
250 | |a [February 1980 ed.]. | ||
260 | |a [Buffalo, N.Y.?] : |b [Acres American Incorporated], |c [1980] | ||
300 | |a 8, [14] p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a "February 1980." | ||
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
510 | 3 | |a Assigned APA Document no. 1218 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a An analysis of alternative airfields to be used to supply a camp at the Watana dam site during construction of the Susitna Hydroelectric Project. Options include large and light aircraft and helicopters. | ||
650 | 0 | |a Airports |z Alaska |z Susitna River Valley |x Planning. | |
650 | 0 | |a Airports |z Alaska |z Susitna River Valley |x Costs. | |
650 | 0 | |a Aeronautics, Commercial |z Alaska |z Susitna River Valley |x Planning. | |
650 | 0 | |a Aeronautics, Commercial |z Alaska |z Susitna River Valley |x Costs. | |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Design and construction |x Planning. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Design and construction |x Planning. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1218. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/12/APA1218.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 01218 |