Design transmittal, Task 2, Analysis of alternative transportation for camp resupply /

An analysis of alternative airfields to be used to supply a camp at the Watana dam site during construction of the Susitna Hydroelectric Project. Options include large and light aircraft and helicopters.

Saved in:
Bibliographic Details
Alternate Title:Task 2, Analysis of alternative transportation for camp resupply.

Alaska Power Authority, Susitna Hydroelectric Project. Design transmittal, Task 2, Analysis of alternative transportation for camp resupply

Analysis of alternative transportation for camp resupply
Main Author: Debelius, C. A.
Corporate Contributor(s):Susitna Hydroelectric Project.

Acres American Incorporated.

Alaska Power Authority.
Publisher:[Acres American Incorporated],
Report Numbers:APA 1218
Edition:[February 1980 ed.].
Series:Document (Susitna Hydroelectric Project) ; no. 1218.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02515cam a2200529Ia 4500
001 1991289
003 SIRSI
005 20140317093506.0
007 cr bn||||a||||
008 131220s1980 nyu 000 0 eng d
035 |a (OCoLC)865781594 
040 |a RLA  |c RLA  |d RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b A23 no. 1218 
088 |a APA 1218 
100 1 |a Debelius, C. A. 
240 1 0 |a Task 2, Analysis of alternative transportation for camp resupply.  |p Design transmittal 
245 1 0 |a Design transmittal, Task 2, Analysis of alternative transportation for camp resupply /  |c prepared by C.A. Debelius. 
246 3 |a Alaska Power Authority, Susitna Hydroelectric Project.  |p Design transmittal, Task 2, Analysis of alternative transportation for camp resupply 
246 3 0 |a Analysis of alternative transportation for camp resupply 
250 |a [February 1980 ed.]. 
260 |a [Buffalo, N.Y.?] :  |b [Acres American Incorporated],  |c [1980] 
300 |a 8, [14] p. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a "February 1980." 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
510 3 |a Assigned APA Document no. 1218 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
520 |a An analysis of alternative airfields to be used to supply a camp at the Watana dam site during construction of the Susitna Hydroelectric Project. Options include large and light aircraft and helicopters. 
650 0 |a Airports  |z Alaska  |z Susitna River Valley  |x Planning. 
650 0 |a Airports  |z Alaska  |z Susitna River Valley  |x Costs. 
650 0 |a Aeronautics, Commercial  |z Alaska  |z Susitna River Valley  |x Planning. 
650 0 |a Aeronautics, Commercial  |z Alaska  |z Susitna River Valley  |x Costs. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Design and construction  |x Planning. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Design and construction  |x Planning. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a Acres American Incorporated. 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1218. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/12/APA1218.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 01218