Water quality modeling study.

The goal of the water quality studies is to assess the effects of the proposed Project on water quality in the Susitna River basin and to identify and develop protection, mitigation, and enhancement measures that can be implemented to minimize these effects.

Saved in:
Bibliographic Details
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.
Publisher:Susitna-Watana Hydroelectric Project,
Report Numbers:SuWa 150
Series:Susitna-Watana Hydroelectric Project document ; no. 150.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 02494cam a2200493Ia 4500
001 1989048
003 SIRSI
005 20131211115622.0
007 ta
007 cr cn||||a||||
008 131211s2012 aku bt s000 0 eng d
035 |a (OCoLC)865021911 
040 |a RLA  |c RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b S92 no. 150 
088 |a SuWa 150 
110 2 |a Alaska Energy Authority. 
245 1 0 |a Water quality modeling study. 
260 |a [Anchorage] :  |b Susitna-Watana Hydroelectric Project,  |c [2012] 
300 |a 7 p. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 150 
500 |a Title from line 1.1. 
500 |a A study proposal requested by Alaska Energy Authority. 
500 |a "Susitna-Watana Hydroelectric Project FERC #14241, Alaska Energy Authority, Water quality modeling study request 5/15/12"--Page footer. 
500 |a ARLIS assigned report number: SuWa 150. 
513 |a Aquatic and fish resources study requests. 
510 3 |a Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Aquatic and fish resources study requests. 
530 |a Available also in electronic format on the Internet. 
520 |a The goal of the water quality studies is to assess the effects of the proposed Project on water quality in the Susitna River basin and to identify and develop protection, mitigation, and enhancement measures that can be implemented to minimize these effects. 
504 |a Includes bibliographical references (p. 7). 
650 0 |a Water quality  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Dams  |x Environmental aspects  |x Research  |z Alaska  |z Susitna River. 
651 0 |a Susitna River (Alaska)  |x Power utilization  |x Environmental aspects  |x Research. 
710 2 |a Susitna-Watana Hydroelectric Project. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 150. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/1/SuWa150.pdf  |3 Direct link to this study request.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/1/SuWa131.html  |3 Link to related AEA-prepared Integrated Licensing Process study requests.  |z ARLIS Document Server 
596 |a 9 10 
098 |a SuWa 00150