Ice processes in the Susitna River.

The goals of this study are: (1) document ice processes in the Susitna River; (2) model ice processes (including flow routing) in the Susitna River in order to estimate the potential for changes for a range of project operations; (3) provide ice processes data to fisheries, instream flow, riparian,...

Full description

Saved in:
Bibliographic Details
Corporate Author: Alaska Energy Authority.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.
Publisher:Susitna-Watana Hydroelectric Project,
Report Numbers:SuWa 145
Series:Susitna-Watana Hydroelectric Project document ; no. 145.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 02400cam a2200457Ia 4500
001 1989045
003 SIRSI
005 20131211114829.0
007 ta
007 cr bn||||a||||
008 131211s2012 aku bt s000 0 eng d
035 |a (OCoLC)865021478 
040 |a RLA  |c RLA  |d RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b S92 no. 145 
088 |a SuWa 145 
110 2 |a Alaska Energy Authority. 
245 1 0 |a Ice processes in the Susitna River. 
260 |a [Anchorage] :  |b Susitna-Watana Hydroelectric Project,  |c [2012] 
300 |a 5 p. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 145 
500 |a Title from data in line 1.1. 
500 |a A study proposal requested by Alaska Energy Authority. 
500 |a "Susitna-Watana Hydroelectric Project FERC #14241, Alaska Energy Authority, Ice processes study request 5/07/12"--Page footer. 
500 |a ARLIS assigned report number: SuWa 145. 
513 |a Aquatic and fish resources study requests. 
510 3 |a Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Aquatic and fish resources study requests. 
530 |a Available also in electronic format on the Internet. 
520 |a The goals of this study are: (1) document ice processes in the Susitna River; (2) model ice processes (including flow routing) in the Susitna River in order to estimate the potential for changes for a range of project operations; (3) provide ice processes data to fisheries, instream flow, riparian, geomorphology, and groundwater studies; (4) assist water quality modeling study with reservoir ice predictions. 
504 |a Includes bibliographical references (p. 5). 
650 0 |a Ice on rivers, lakes, etc.  |x Research  |z Alaska  |z Susitna River. 
710 2 |a Susitna-Watana Hydroelectric Project. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 145. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/1/SuWa145.pdf  |3 Direct link to this study request.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/1/SuWa131.html  |3 Link to related AEA-prepared Integrated Licensing Process study requests.  |z ARLIS Document Server 
596 |a 9 10 
098 |a SuWa 00145