Technical memorandum, Framework for preparation of comparisons documents /
This technical memorandum presents a framework for conducting the analyses leading to an environmental and economic comparisons report and the supporting Case E-VI impact and mitigation report series. The purpose of the analyses is to develop a set of reports to support the selection of a set of env...
Saved in:
Alternate Title: | Framework for preparation of comparisons documents |
---|---|
Corporate Contributor(s): | United States. Federal Energy Regulatory Commission. Alaska Power Authority. Susitna Hydroelectric Project. HARZA-EBASCO Susitna Joint Venture. Entrix, Inc. |
Publisher: | [Entrix, Inc.], |
Report Numbers: | SUS 566 |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02312cam a2200445Ia 4500 | ||
---|---|---|---|
001 | 1980731 | ||
003 | SIRSI | ||
005 | 20140324041821.0 | ||
007 | cr cn||||a|||| | ||
008 | 131023s1985 akua t 000 0 eng d | ||
035 | |a (OCoLC)861303132 | ||
040 | |a RLA |c RLA |d RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.S8 |b S9 no. 566 | |
088 | |a SUS 566 | ||
245 | 0 | 0 | |a Technical memorandum, Framework for preparation of comparisons documents / |c prepared for Harza-Ebasco Susitna Joint Venture ; Entrix, Inc. |
246 | 3 | 0 | |a Framework for preparation of comparisons documents |
260 | |a [Anchorage, Alaska] : |b [Entrix, Inc.], |c [1985] | ||
300 | |a 11 p. : |b ill. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project, Federal Energy Regulatory Commission, Project No. 7114. | ||
500 | |a "October 1985." | ||
510 | 3 | |a Assigned SUS document no. 566 in the Susitna Aquatic Impact Assessment Project bibliography. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a This technical memorandum presents a framework for conducting the analyses leading to an environmental and economic comparisons report and the supporting Case E-VI impact and mitigation report series. The purpose of the analyses is to develop a set of reports to support the selection of a set of environmental constraints through negotiations between the Alaska Power Authority and the resource agencies. These negotiations are part of the overall settlement process for the Susitna River Hydroelectric Project. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Research. |
650 | 0 | |a Dams |x Environmental aspects |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |x Research |z Alaska |z Susitna River. | |
710 | 1 | |a United States. |b Federal Energy Regulatory Commission. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Entrix, Inc. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/SUS/5/SUS566.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a SUS 00566 |