Appendix 3, Comment response table of informal consultation, July-November 2012 /
A table of responses from AEA to comments from organizations on AEA's Proposed study plan submitted to FERC. Those organizations include 13 state and federal agencies, 1 federal council, and 5 advocacy groups.
Saved in:
Alternate Title: | Revised study plan, Susitna-Watana Hydroelectric Project, FERC No. 14241. Comment response table of informal consultation, July-November 2012 At head of title: Revised Study Plan, Susitna-Watana Hydroelectric Project, FERC No. 14241 Revised study plan Appendix 3, Alaska Energy Authority's response to comments on the Proposed study plan (consultation dated July through early November, 2012) Alaska Energy Authority's response to comments on the Proposed study plan (consultation dated July through early November, 2012) |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. Alaska Energy Authority. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 79 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 79. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03449cam a2200589Ia 4500 | ||
---|---|---|---|
001 | 1980721 | ||
003 | SIRSI | ||
005 | 20160908181731.0 | ||
007 | ta | ||
007 | cr cn||a|||||| | ||
008 | 131023s2012 aku s000 0 eng d | ||
040 | |a RLA |c RLA |d RLA |d OCLCO |d RLA | ||
035 | |a (OCoLC)861301865 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S92 no. 79 | |
088 | |a SuWa 79 | ||
110 | 2 | |a Alaska Energy Authority. | |
240 | 1 | 0 | |a Revised study plan, Susitna-Watana Hydroelectric Project, FERC No. 14241. |n Appendix 3, |p Comment response table of informal consultation, July-November 2012 |
245 | 1 | 0 | |a Appendix 3, Comment response table of informal consultation, July-November 2012 / |c Alaska Energy Authority. |
246 | 3 | 0 | |a Comment response table of informal consultation, July-November 2012 |
246 | 1 | |i At head of title: |a Revised Study Plan, Susitna-Watana Hydroelectric Project, FERC No. 14241 | |
246 | 1 | 7 | |a Revised study plan |
246 | 1 | 6 | |a Appendix 3, Alaska Energy Authority's response to comments on the Proposed study plan (consultation dated July through early November, 2012) |
246 | 3 | |a Alaska Energy Authority's response to comments on the Proposed study plan (consultation dated July through early November, 2012) | |
260 | |a [Anchorage : |b Alaska Energy Authority, |c 2012] | ||
300 | |a 131 p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 79 | |
500 | |a ARLIS assigned report number: SuWa 79. | ||
513 | |a Revised study plan. | ||
510 | 3 | |a Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Revised study plan. | |
500 | |a Appendix to: Revised study plan, Susitna-Watana Hydroelectric Project, FERC No. 14241 / Alaska Energy Authority. [Anchorage : Alaska Energy Authority, 2012]. -- (SuWa 76). | ||
530 | |a Available also in electronic format on the Internet. | ||
520 | |a A table of responses from AEA to comments from organizations on AEA's Proposed study plan submitted to FERC. Those organizations include 13 state and federal agencies, 1 federal council, and 5 advocacy groups. | ||
610 | 2 | 0 | |a Alaska Energy Authority. |t Proposed study plan, Susitna-Watana Hydroelectric Project, FERC No. 14241. |
610 | 2 | 0 | |a Susitna-Watana Hydroelectric Project |x Research. |
610 | 2 | 0 | |a Susitna-Watana Hydroelectric Project |x Public opinion. |
650 | 0 | |a Hydroelectric power plants |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Dams |x Research |z Alaska |z Susitna River. | |
651 | 0 | |a Susitna River (Alaska) |x Power utilization |x Research. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Public opinion. | |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Public opinion. | |
651 | 0 | |a Susitna River (Alaska) |x Power utilization |x Public opinion. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
710 | 2 | |i Appendix to: |a Alaska Energy Authority. |t Revised study plan, Susitna-Watana Hydroelectric Project, FERC No. 14241. | |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 79. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa79.pdf |3 Link to this volume. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa76.html |3 Link to the main text and all other appendices. |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a SuWa 00079 |