Appendix 3, Comment response table of informal consultation, July-November 2012 /
A table of responses from AEA to comments from organizations on AEA's Proposed study plan submitted to FERC. Those organizations include 13 state and federal agencies, 1 federal council, and 5 advocacy groups.
Saved in:
Alternate Title: | Revised study plan, Susitna-Watana Hydroelectric Project, FERC No. 14241. Comment response table of informal consultation, July-November 2012 At head of title: Revised Study Plan, Susitna-Watana Hydroelectric Project, FERC No. 14241 Revised study plan Appendix 3, Alaska Energy Authority's response to comments on the Proposed study plan (consultation dated July through early November, 2012) Alaska Energy Authority's response to comments on the Proposed study plan (consultation dated July through early November, 2012) |
---|---|
Corporate Author: | |
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. Alaska Energy Authority. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 79 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 79. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | A table of responses from AEA to comments from organizations on AEA's Proposed study plan submitted to FERC. Those organizations include 13 state and federal agencies, 1 federal council, and 5 advocacy groups. |
---|---|
Physical Description: | 131 p. ; 28 cm. |
Notes: | ARLIS assigned report number: SuWa 79. Appendix to: Revised study plan, Susitna-Watana Hydroelectric Project, FERC No. 14241 / Alaska Energy Authority. [Anchorage : Alaska Energy Authority, 2012]. -- (SuWa 76). |
Report Type: | Revised study plan. |