Intertie newsletter. March 1982

Saved in:
Bibliographic Details
Corporate Contributor(s):Alaska Power Authority. Public Participation Office.
Publisher:Alaska Power Authority Public Participation Office,
Report Numbers:SUS 319
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 01550cam a2200349Ia 4500
001 1980688
003 SIRSI
005 20140320091113.0
007 he bmu---bbca
007 cr bn||||a||||
008 131023s1982 akuab s000 0 eng d
035 |a (OCoLC)861288261 
040 |a RLA  |c RLA  |d RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b S9 no. 319 
088 |a SUS 319 
245 0 0 |a Intertie newsletter.  |n March 1982 
260 |a Anchorage, Alaska :  |b Alaska Power Authority Public Participation Office,  |c [1982] 
300 |a [6] p. :  |b ill., maps ;  |c 28 cm. 
337 |a unmediated  |b n  |2 rdamedia 
510 3 |a The March 1982 issue only of this newsletter was assigned SUS document no. 319 in the Susitna Aquatic Impact Assessment Project bibliography. This issue was used as supporting documentation for research by the Susitna Hydroelectric Project. 
530 |a Available also in microfiche format and electronic format on the Internet. 
500 |a "This mailing of the Public Participation Office is the method of bringing people up-to-date on the status of the Willow to Healy transmission line."--Issue for March 1982. 
650 0 |a Interconnected electric utility systems  |z Alaska  |x Planning. 
650 0 |a Energy development  |z Alaska  |x Citizen participation. 
655 0 |a Newsletters. 
710 2 |a Alaska Power Authority.  |b Public Participation Office. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/SUS/3/SUS319.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a SUS 00319