Alaska Power Authority Board of Directors Meeting : Juneau Borough Chambers, Friday, May 3, 1985, 8:30 a.m.

Saved in:
Bibliographic Details
Alternate Title:Title entered in the Susitna Hydroelectric Project document index as: Licensing review and consideration of proposed staging of construction of the Susitna Hydroelectric Project
Corporate Author: Alaska Power Authority. Board of Directors. Meeting (1985 : Juneau, Alaska)
Corporate Contributor(s):Alaska Power Authority.

Susitna Hydroelectric Project. External Review Panel. Engineering Sub-Panel. Meeting (2nd : 1985 : Anchorage, Alaska)
Publisher:[Alaska Power Authority],
Report Numbers:SUS 505

SUS 523
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02848cam a2200469Ia 4500
001 1979630
003 SIRSI
005 20140317093508.0
007 cr bn||||a||||
008 131022s1985 akua 100 0 eng d
035 |a (OCoLC)861237519 
040 |a RLA  |c RLA  |d RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b S9 no. 505 
088 |a SUS 505 
088 |a SUS 523 
110 2 |a Alaska Power Authority.  |b Board of Directors.  |b Meeting  |d (1985 :  |c Juneau, Alaska) 
245 1 0 |a Alaska Power Authority Board of Directors Meeting :  |b Juneau Borough Chambers, Friday, May 3, 1985, 8:30 a.m. 
246 1 |i Title entered in the Susitna Hydroelectric Project document index as:  |a Licensing review and consideration of proposed staging of construction of the Susitna Hydroelectric Project 
260 |a [Anchorage, Alaska] :  |b [Alaska Power Authority],  |c [1985] 
300 |a [66] p. :  |b ill. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
510 3 |a Assigned SUS no. 505 in the Susitna Aquatic Impact Assessment Project bibliography. Also assigned no. 523 (duplicate number). 
530 |a Available also in electronic format on the Internet. 
500 |a Supplement 1 includes: Alaska Power Authority Susitna Hydroelectric Project staged construction : engineering. [12] p. -- Susitna Hydroelectric Project External Review Panel, Engineering Sub-Panel Meeting, Report no. 2, April 16, 1985. [6] p.-- Susitna Hydroelectric Project External Review Panel Meeting on Staged Construction, April 15 and 16, 1985 : agenda [1] p. -- [List of attendees list for the April 15 Engineering Sub-Panel Meeting]. [1] p. 
505 0 |a Old business : action items -- Supplement 1. Engineering -- Supplement 2. Project costs and economics -- Supplement 3. Power and energy production -- Supplement 4. Financial analysis -- Supplement 5. Environmental analysis. 
610 2 0 |a Susitna Hydroelectric Project  |v Congresses. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Design and construction  |v Congresses. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Design and construction  |v Congresses. 
650 0 |a Habitat (Ecology)  |x Modification  |z Alaska  |z Susitna River Watershed  |v Congresses. 
651 0 |a Susitna River (Alaska)  |x Power utilization  |v Congresses. 
710 2 |a Alaska Power Authority. 
710 2 |a Susitna Hydroelectric Project.  |b External Review Panel.  |b Engineering Sub-Panel.  |b Meeting  |n (2nd :  |d 1985 :  |c Anchorage, Alaska) 
740 0 2 |a Susitna Hydroelectric Project External Review Panel, Engineering Sub-Panel Meeting, Report no. 2, April 16, 1985. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/SUS/5/SUS505.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a SUS 00505 
098 |a SUS 00523