Susitna Hydro transmission study, EPS Job #09-0254 /

The Alaska Energy Authority has asked Electric Power Systems, Inc. (EPS) to determine the required system improvements to the Railbelt electrical system to support the proposed Susitna Hydroelectric Project. Specifically, this study evaluated the feasibility of the Susitna project and identified the...

Full description

Saved in:
Bibliographic Details
Alternate Title:AEA - Susitna Hydro transmission study
Main Author: Cote, James W.
Additional Author(s):Burlingame, David W.

Ridge, Kelly.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.

Electric Power Systems, Inc.
Publisher:Electric Power Systems, Inc.,
Report Numbers:SuWa 193
Series:Susitna-Watana Hydroelectric Project document ; no. 193.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Executive summary
  • Introduction
  • Power flow base cases and modeling issues
  • Transient stability cases
  • Transmission cost estimates
  • Conclusions
  • appendix A. Power flow one line diagrams
  • appendix B. Stability plots.