Susitna Hydro transmission study, EPS Job #09-0254 /

The Alaska Energy Authority has asked Electric Power Systems, Inc. (EPS) to determine the required system improvements to the Railbelt electrical system to support the proposed Susitna Hydroelectric Project. Specifically, this study evaluated the feasibility of the Susitna project and identified the...

Full description

Saved in:
Bibliographic Details
Alternate Title:AEA - Susitna Hydro transmission study
Main Author: Cote, James W.
Additional Author(s):Burlingame, David W.

Ridge, Kelly.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.

Electric Power Systems, Inc.
Publisher:Electric Power Systems, Inc.,
Report Numbers:SuWa 193
Series:Susitna-Watana Hydroelectric Project document ; no. 193.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03105cam a2200505Ia 4500
001 1979084
003 SIRSI
005 20131125120143.0
007 cr cn||||a||||
008 131021s2009 wauad t s000 0 eng d
035 |a (OCoLC)861192276 
040 |a RLA  |c RLA  |d RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b S92 no. 193 
088 |a SuWa 193 
100 1 |a Cote, James W. 
245 1 0 |a Susitna Hydro transmission study, EPS Job #09-0254 /  |c prepared for Alaska Energy Authority ; prepared by James W. Cote, David W. Burlingame, Kelly Ridge, Electric Power Systems, Inc. 
246 1 7 |a AEA - Susitna Hydro transmission study 
260 |a Redmond, WA :  |b Electric Power Systems, Inc.,  |c [2009] 
300 |a iii, 12, [236] p. :  |b ill., col. charts ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 193 
500 |a Chiefly colored charts. 
500 |a "October 22, 2009. 
500 |a Downloaded from the Alaska Energy Authority's Susitna Reports webpage on September 23, 2013. 
500 |a ARLIS assigned report number: SuWa 193. 
530 |a Available also in electronic format on the Internet. 
520 |a The Alaska Energy Authority has asked Electric Power Systems, Inc. (EPS) to determine the required system improvements to the Railbelt electrical system to support the proposed Susitna Hydroelectric Project. Specifically, this study evaluated the feasibility of the Susitna project and identified the basic electrical infrastructure improvements necessary to support the project. EPS evaluated the operation of the Railbelt electrical system with the addition of the project in the 2020 time frame. EPS studied two generation levels for the project, 420 MW and 600 MW. The project interconnects with the existing Railbelt system along the existing Anchorage-Fairbanks Intertie between Cantwell and Stevens substations. The report is separated into two sections, the first is the electrical studies required to identify the Railbelt improvements necessary to support the Susitna Project and the second part includes feasibility level costs estimates for the projects identified in the studies. 
655 0 |a Feasibility studies  |z Alaska. 
505 0 |a Executive summary -- Introduction -- Power flow base cases and modeling issues -- Transient stability cases -- Transmission cost estimates -- Conclusions -- appendix A. Power flow one line diagrams -- appendix B. Stability plots. 
650 0 |a Power resources  |z Alaska. 
650 0 |a Electric power production  |z Alaska. 
700 1 |a Burlingame, David W. 
700 1 |a Ridge, Kelly. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a Alaska Energy Authority. 
710 2 |a Electric Power Systems, Inc. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 193. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/1/SuWa193.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a SuWa 00193