Alaska Railbelt Regional Integrated Resource Plan (RIRP) study : final report /

This report sets out a "directional plan" for the state when making energy plans and policies. It identifies types of energy resources that should be developed in the future and identifies resource paths that Alaska Railbelt can take to meet future needs. It is beyond the scope of this rep...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska RIRP study
Corporate Contributor(s):Black & Veatch.

Alaska Energy Authority.
Publisher:[Black & Veatch],
Report Numbers:SuWa 130
Series:Susitna-Watana Hydroelectric Project document ; no. 130.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03059cam a2200481Ia 4500
001 1978918
003 SIRSI
005 20131114094156.0
007 ta
007 cr cn||||a||||
008 131017s2010 ksuabd s000 0 eng d
035 |a (OCoLC)860914536 
040 |a RLA  |c RLA  |d RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b S92 no. 130 
088 |a SuWa 130 
245 0 0 |a Alaska Railbelt Regional Integrated Resource Plan (RIRP) study :  |b final report /  |c Black & Veatch. 
246 1 7 |a Alaska RIRP study 
260 |a [Overland Park, Kan.] :  |b [Black & Veatch],  |c [2010] 
300 |a 393 in various pagings :  |b col. ill., col. maps, col. charts ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 130 
500 |a "February 2010." 
500 |a ARLIS assigned report number: SuWa 130. 
513 |a Energy planning documents. 
510 3 |a Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Energy planning documents. 
530 |a Available also in electronic format on the Internet. 
650 0 |a Energy development  |z Alaska  |x Planning. 
520 |a This report sets out a "directional plan" for the state when making energy plans and policies. It identifies types of energy resources that should be developed in the future and identifies resource paths that Alaska Railbelt can take to meet future needs. It is beyond the scope of this report to identify optimal configuration of specific resources. Black & Veatch had primary responsibility in conducting the Railbelt RIRP, although three other contractors had made contributions. 
505 0 |a Executive summary -- Project overview and approach -- Situational assessment -- Description of existing system -- Economic parameters -- Forecast of electrical demand and consumption -- Fuel and emissions allowance price projections -- Reliability criteria -- Capacity requirements -- Supply-side options -- Demand-side management/energy efficiency resources -- Transmission projects -- Summary of results -- Implementation risks and issues -- Conclusions and recommendations -- Near-term implementation action plan (2010-2012) -- appendix A. Susitna analysis -- appendix B. Financial analysis -- appendix C. Existing generation units -- appendix D. Regional load forecasts -- appendix E. Detailed results : scenarios 1A/1B -- appendix F. Detailed results : scenario 2A -- appendix G. Detailed results : scenario 2B. 
650 0 |a Electric power  |z Alaska  |x Planning. 
650 0 |a Power resources  |z Alaska. 
650 0 |a Electric power consumption  |z Alaska  |x Forecasting. 
710 2 |a Black & Veatch. 
710 2 |a Alaska Energy Authority. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 130. 
043 |a n-us-ak 
098 |a SuWa 00130 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/1/SuWa130.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10