Watana transportation access analysis, Project no. 82002 /

This report provides a preliminary assessment of three alternative rail and road access routes presently under consideration for the Susitna-Watana Hydroelectric Project to be used during construction and for the operational life of the dam, and evaluates proposed airport locations for the support o...

Full description

Saved in:
Bibliographic Details
Alternate Title:Watana transportation access study, June 2012
Corporate Contributor(s):Alaska. Department of Transportation and Public Facilities.

HDR Alaska, Inc.

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 90
Edition:Draft.
Series:Susitna-Watana Hydroelectric Project document ; no. 90.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03107cam a2200553Ia 4500
001 1978635
003 SIRSI
008 131014s2012 akuab bt s000 0 eng d
005 20131107083456.0
007 cr cn||||a||||
035 |a (OCoLC)860723959 
040 |a RLA  |c RLA  |d RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b S92 no. 90 
088 |a SuWa 90 
245 0 0 |a Watana transportation access analysis, Project no. 82002 /  |c prepared for Alaska Department of Transportation and Public Facilities ; prepared by HDR Alaska, Inc. 
246 1 7 |a Watana transportation access study, June 2012 
250 |a Draft. 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2012] 
300 |a xvi, 108 p. :  |b col. ill., col. maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 90 
500 |a "June 2012." 
500 |a ARLIS assigned report number: SuWa 90. 
513 |a Alaska Department of Transportation access analysis. 
510 3 |a Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage (by chapters and without title) under the category: Alaska Department of Transportation access analysis. 
530 |a Available also in electronic format on the Internet. 
520 |a This report provides a preliminary assessment of three alternative rail and road access routes presently under consideration for the Susitna-Watana Hydroelectric Project to be used during construction and for the operational life of the dam, and evaluates proposed airport locations for the support of construction. The intent is to provide a reconnaissance-level study based on engineering, scientific and environmental information. Additional information regarding environmental and other issues related to the routes will be developed later as part of the National Environmental Policy Act process. 
505 0 |a Introduction -- Previous access route studies -- Access corridor identification -- Screening -- Summary of findings -- Airport. 
504 |a Includes bibliographical references (p. 104-108). 
650 0 |a Transportation  |z Alaska  |z Susitna River Region  |x Planning. 
650 0 |a Roads  |z Alaska  |z Susitna River Region  |x Planning. 
650 0 |a Railroad tracks  |z Alaska  |z Susitna River Region  |x Design and construction. 
650 0 |a Airports  |z Alaska  |z Susitna River Valley  |x Planning. 
650 0 |a Airports  |x Location  |z Alaska  |z Susitna River Valley. 
650 0 |a Dams  |x Access roads  |z Alaska  |z Susitna River Region. 
650 4 |a Access roads  |z Alaska  |z Susitna River Region. 
710 1 |a Alaska.  |b Department of Transportation and Public Facilities. 
710 2 |a HDR Alaska, Inc. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a Alaska Energy Authority. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 90. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa90.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a SuWa 00090