Environmental socioeconomic and land use analysis of alternative access plans for the Susitna Hydroelectric Project /

"The purpose of this report is to provide environmental input into the selection of an access plan for the Susitna Hydroelectric Project and to recommend an access plan that, from a total environmental standpoint, is judged to have the least impact, both short-term and long-term."--P. 1-1.

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Environmental socioeconomic and land use analysis of alternative access plans for the Susitna Hydroelectric Project
Corporate Contributor(s):Terrestrial Environmental Specialists.

Acres American Incorporated.

Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Terrestrial Environmental Specialists, Inc.,
Report Numbers:APA 10

APA 84

APA 297

APA 1327

SUS 56
Series:Document (Susitna Hydroelectric Project) ; no. 10.
Document (Susitna Hydroelectric Project) ; no. 84.
Document (Susitna Hydroelectric Project) ; no. 297.
Document (Susitna Hydroelectric Project) ; no. 1327.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Environmental analysis. Methods ; Criteria for evaluation ; Description of environmental resources ; Impact assessment ; Habitat value comparison ; Mitigation ; Conclusions
  • Socioeconomic and land use analysis. Methods ; Criteria for evaluation ; Description of resources ; Impact assessment ; Mitigation ; Conclusions.