Environmental socioeconomic and land use analysis of alternative access plans for the Susitna Hydroelectric Project /
"The purpose of this report is to provide environmental input into the selection of an access plan for the Susitna Hydroelectric Project and to recommend an access plan that, from a total environmental standpoint, is judged to have the least impact, both short-term and long-term."--P. 1-1.
Saved in:
Alternate Title: | Alaska Power Authority, Environmental socioeconomic and land use analysis of alternative access plans for the Susitna Hydroelectric Project |
---|---|
Corporate Contributor(s): | Terrestrial Environmental Specialists. Acres American Incorporated. Alaska Power Authority. HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Terrestrial Environmental Specialists, Inc., |
Report Numbers: | APA 10 APA 84 APA 297 APA 1327 SUS 56 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 10. Document (Susitna Hydroelectric Project) ; no. 84. Document (Susitna Hydroelectric Project) ; no. 297. Document (Susitna Hydroelectric Project) ; no. 1327. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Introduction
- Environmental analysis. Methods ; Criteria for evaluation ; Description of environmental resources ; Impact assessment ; Habitat value comparison ; Mitigation ; Conclusions
- Socioeconomic and land use analysis. Methods ; Criteria for evaluation ; Description of resources ; Impact assessment ; Mitigation ; Conclusions.