Draft Susitna hydropower feasibility analysis : environmental assessment.

"The function of this environmental assessment is to conduct a systematic and analytical assessment of the environmental impacts, including ways to minimize adverse impacts, related to the field activities of the project feasibility analysis as detailed in the June 1978 'Plan of Study for...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna hydropower feasibility analysis : environmental assessment
Corporate Contributor(s):United States. Army. Corps of Engineers. Alaska District.
Publisher:Alaska District, U.S. Army Corps of Engineers,
Report Numbers:APA 3294
Series:Document (Susitna Hydroelectric Project) ; no. 3294.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 03146cam a2200469Ia 4500
001 1637749
003 SIRSI
005 20160505125045.0
006 e a f 0
007 ta
007 cr cn||||a||||
007 aj aanzn
008 821130s1978 akub t f000 0 eng d
040 |a Ak  |b eng  |c ALK  |d RLA  |d OCLCA  |d OCLCF  |d OCL  |d OCLCO  |d OCLCQ  |d RLA 
035 |a (OCoLC)41701647 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 3294 
088 |a APA 3294 
049 |a RLAA 
245 0 0 |a Draft Susitna hydropower feasibility analysis :  |b environmental assessment. 
246 1 6 |a Susitna hydropower feasibility analysis :  |b environmental assessment 
260 |a [Alaska] :  |b Alaska District, U.S. Army Corps of Engineers,  |c [1978] 
300 |a 63, 1 pages ;  |c 27 cm +  |e 10 maps (each 34 x 49 cm, on sheets 37 x 53 cm). 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a Cover title. 
500 |a "December 1978." 
510 3 |a Assigned APA Document no. 3294 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
520 |a "The function of this environmental assessment is to conduct a systematic and analytical assessment of the environmental impacts, including ways to minimize adverse impacts, related to the field activities of the project feasibility analysis as detailed in the June 1978 'Plan of Study for Susitna Feasibility Analysis.' This project feasibility will consist of engineering, economic, social, and biological studies which are considered necessary to establish the feasibility of developing the upper Susitna hydropower potential."--Page [1]. 
505 0 |a [Main report] -- Figure 1. [Upper Susitna River profile : river miles 120-290] -- Figure 2. Proposed transmission corridor -- Figure 3. Watana damsite field camp facilities -- Figure 4. Devil Canyon, field camp facilities -- Figure 5. Proposed access corridor : Denali Highway to Watana damsite -- [Figure] 6. Climatology and streamgaging stations -- Figure 7. Climatology and streamgaging stations -- Figure 8. Proposed access route corridor : Chulitna to Devil Canyon damsite to Watana damsite -- Figure 9. Watana damsite borrow site exploration and testing locations -- Figure 10. Land status. 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Design and construction  |v Maps. 
651 0 |a Susitna River (Alaska)  |x Power utilization. 
710 1 |a United States.  |b Army.  |b Corps of Engineers.  |b Alaska District. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 3294. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/32/APA3294.pdf  |x This URL for the text is needed for the image to display in the OPAC.  |3 Direct link to the text of the main report.  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/32/APA3294.html  |3 List of text and figures.  |z ARLIS Document Server 
596 |a 9 10 11 23 
098 |a APA 03294