Draft Susitna hydropower feasibility analysis : environmental assessment.
"The function of this environmental assessment is to conduct a systematic and analytical assessment of the environmental impacts, including ways to minimize adverse impacts, related to the field activities of the project feasibility analysis as detailed in the June 1978 'Plan of Study for...
Saved in:
Alternate Title: | Susitna hydropower feasibility analysis : environmental assessment |
---|---|
Corporate Contributor(s): | United States. Army. Corps of Engineers. Alaska District. |
Publisher: | Alaska District, U.S. Army Corps of Engineers, |
Report Numbers: | APA 3294 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 3294. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03146cam a2200469Ia 4500 | ||
---|---|---|---|
001 | 1637749 | ||
003 | SIRSI | ||
005 | 20160505125045.0 | ||
006 | e a f 0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
007 | aj aanzn | ||
008 | 821130s1978 akub t f000 0 eng d | ||
040 | |a Ak |b eng |c ALK |d RLA |d OCLCA |d OCLCF |d OCL |d OCLCO |d OCLCQ |d RLA | ||
035 | |a (OCoLC)41701647 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 3294 | |
088 | |a APA 3294 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Draft Susitna hydropower feasibility analysis : |b environmental assessment. |
246 | 1 | 6 | |a Susitna hydropower feasibility analysis : |b environmental assessment |
260 | |a [Alaska] : |b Alaska District, U.S. Army Corps of Engineers, |c [1978] | ||
300 | |a 63, 1 pages ; |c 27 cm + |e 10 maps (each 34 x 49 cm, on sheets 37 x 53 cm). | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a Cover title. | ||
500 | |a "December 1978." | ||
510 | 3 | |a Assigned APA Document no. 3294 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a "The function of this environmental assessment is to conduct a systematic and analytical assessment of the environmental impacts, including ways to minimize adverse impacts, related to the field activities of the project feasibility analysis as detailed in the June 1978 'Plan of Study for Susitna Feasibility Analysis.' This project feasibility will consist of engineering, economic, social, and biological studies which are considered necessary to establish the feasibility of developing the upper Susitna hydropower potential."--Page [1]. | ||
505 | 0 | |a [Main report] -- Figure 1. [Upper Susitna River profile : river miles 120-290] -- Figure 2. Proposed transmission corridor -- Figure 3. Watana damsite field camp facilities -- Figure 4. Devil Canyon, field camp facilities -- Figure 5. Proposed access corridor : Denali Highway to Watana damsite -- [Figure] 6. Climatology and streamgaging stations -- Figure 7. Climatology and streamgaging stations -- Figure 8. Proposed access route corridor : Chulitna to Devil Canyon damsite to Watana damsite -- Figure 9. Watana damsite borrow site exploration and testing locations -- Figure 10. Land status. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Design and construction |v Maps. | |
651 | 0 | |a Susitna River (Alaska) |x Power utilization. | |
710 | 1 | |a United States. |b Army. |b Corps of Engineers. |b Alaska District. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 3294. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/32/APA3294.pdf |x This URL for the text is needed for the image to display in the OPAC. |3 Direct link to the text of the main report. |z ARLIS Document Server |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/32/APA3294.html |3 List of text and figures. |z ARLIS Document Server |
596 | |a 9 10 11 23 | ||
098 | |a APA 03294 |