Task 2, Surveys and site facilities. Subtask 2.10, Access planning study /

"The Access Planning Study involved the selection of potential highway and railroad alignments that would serve the dam sites selected for detailed study. The process involved aerial reconnaissance of the potential corridors, definition of the parameters which control the horizontal and vertica...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Access planning study

Alaska Power Authority, Susitna Hydroelectric Project. Access planning study

Surveys and site facilities. Subtask 2.10, Access planning study

Subtask 2.10, Access planning study

Access planning study
Corporate Contributor(s):Acres American Incorporated.

R & M Consultants.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 3

APA 1208

SUS 57
Edition:[Final].
Series:Document (Susitna Hydroelectric Project) ; no. 3.
Document (Susitna Hydroelectric Project) ; no. 1208.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • appendix A.
  • Preliminary design development
  • appendix B.
  • Proposed alternative segments
  • appendix C.
  • Alternative comparison: grade, curvature and distance
  • appendix D.
  • Terrain mapping
  • appendix E.
  • Environmental concerns
  • appendix F.
  • Cost estimates
  • appendix G.
  • Barrow pits.