Task 2, Surveys and site facilities. Subtask 2.10, Access planning study /
"The Access Planning Study involved the selection of potential highway and railroad alignments that would serve the dam sites selected for detailed study. The process involved aerial reconnaissance of the potential corridors, definition of the parameters which control the horizontal and vertica...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Access planning study Alaska Power Authority, Susitna Hydroelectric Project. Access planning study Surveys and site facilities. Subtask 2.10, Access planning study Subtask 2.10, Access planning study Access planning study |
---|---|
Corporate Contributor(s): | Acres American Incorporated. R & M Consultants. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 3 APA 1208 SUS 57 |
Edition: | [Final]. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 3. Document (Susitna Hydroelectric Project) ; no. 1208. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- appendix A.
- Preliminary design development
- appendix B.
- Proposed alternative segments
- appendix C.
- Alternative comparison: grade, curvature and distance
- appendix D.
- Terrain mapping
- appendix E.
- Environmental concerns
- appendix F.
- Cost estimates
- appendix G.
- Barrow pits.