%0 Book %I Alaska Power Authority %D 1982 %C Anchorage, Alaska %G English %B Document (Susitna Hydroelectric Project) ; %B Document (Susitna Hydroelectric Project) ; %T Task 2, Surveys and site facilities. Subtask 2.10, Access planning study %U https://www.arlis.org/docs/vol1/Susitna/0/APA3.pdf %7 Array %X "The Access Planning Study involved the selection of potential highway and railroad alignments that would serve the dam sites selected for detailed study. The process involved aerial reconnaissance of the potential corridors, definition of the parameters which control the horizontal and vertical alignment and the selection and analysis of alternative alignments which serve the needs of the entire project."--P. 1-1.