Alaska Power Authority response to agency comments on license application. Reference to comment(s): B. 8, I. 75, Preliminary environmental assessment of hydroelectric development on the Susitna River.

A report on biological and water quality investigations conducted in 1977-1978 to obtain baseline data on indigenous fish and moose populations and the existing aquatic habitat of the Susitna River drainage as part of the Susitna Hydroelectric Project in Alaska.

Saved in:
Bibliographic Details
Alternate Title:Preliminary environmental assessment of hydroelectric development on the Susitna River. Selections.

Fisheries and habitat investigations of the Susitna River--a preliminary study of potential impacts of the Devils Canyon and Watana hydroelectric projects.

Moose movements and habitat use along the upper Susitna River--a preliminary study of potential impacts of the Devils Canyon hydroelectric project.
Additional Author(s):Friese, Nancy V.

Ballard, Warren B.

Riis, Jim.

Taylor, Kenton P.
Corporate Contributor(s):Alaska. Department of Fish and Game.

U.S. Fish and Wildlife Service.

Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.
Publisher:[Alaska Power Authority],
Report Numbers:APA 2905 I.75
Series:Document (Susitna Hydroelectric Project) ; no. 2905, I.75.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Contents:
  • Section I. Fisheries and habitat investigations of the Susitna River
  • a preliminary study of potential impacts of the Devils Canyon and Watana hydroelectric projects / James C. Riis and Nancy V. Friese
  • Section II. Moose movements and habitat use along the upper Susitna River
  • a preliminary study of potential impacts of the Devils Canyon hydroelectric project / by Kenton P. Taylor and Warren B. Ballard.