%0 Book %I Battelle, Pacific Northwest Laboratories %D 1982 %C Richland, Wash. %G English %B Railbelt electric power alternatives study ; %B Document (Susitna Hydroelectric Project) ; %T Chakachamna hydroelectric alternative for the Railbelt region of Alaska %U https://www.arlis.org/docs/vol1/Susitna/5/APA578.pdf %X This report describes plans for hydroelectric power generation by diverting water from Lake Chakachamna through a tunnel southeasterly to a powerhouse at the McArthur River. In this scenario, no dam is built. Engineering, scocioeconomic, cost, and environmental constraints are discussed.