Slough hydrogeology report

"The objective of this study task is to understand slough hydrology under existing, natural conditions and thus provide a methodology by which post-project conditions can be predicted. The study is comprised of four stages: data collection, data interpretation, modeling of existing conditions t...

Full description

Saved in:
Bibliographic Details
Alternate Title:Title on fiche header: Slough hydrology report

Susitna Hydroelectric Project. Slough hydrogeology studies report

Susitna Hydroelectric Project. Slough hydrogeology report

Draft Susitna Hydroelectric Project slough hydrogeology report
Corporate Contributor(s):Acres American Incorporated.

Susitna Hydroelectric Project.
Publisher:[Acres American],
Report Numbers:APA 519

SUS 165
Series:Document (Susitna Hydroelectric Project) ; no. 519.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03057cam a2200577Ia 4500
001 1098734
003 SIRSI
005 20120726120007.0
007 he bmu---bbca
007 cr bn||||a||||
008 061205s1983 akuad b 000 0 eng d
035 |a (OCoLC)76884582 
040 |a RLA  |c RLA  |d RLA 
049 |a RLAA 
088 |a APA 519 
088 |a SUS 165 
090 |a TK1425.S8  |b A23 no. 519 
245 0 0 |a Slough hydrogeology report 
246 1 |i Title on fiche header:  |a Slough hydrology report 
246 1 6 |a Susitna Hydroelectric Project.  |p Slough hydrogeology studies report 
246 3 |a Susitna Hydroelectric Project.  |p Slough hydrogeology report 
246 3 |a Draft Susitna Hydroelectric Project slough hydrogeology report 
260 |a [Anchorage, Alaska] :  |b [Acres American],  |c [1983] 
300 |a [2], ii, 27, [18] p. :  |b ill. ;  |c 28 cm. 
490 1 |a [Document ;  |v no. 519] 
500 |a At head of title: Draft, Susitna Hydroelectric Project. 
500 |a Publisher from microfiche header. 
513 |a Draft. 
500 |a "March 1983." 
510 3 |a Assigned APA document no. 519 in Susitna Hydroelectric Project document index. 
510 3 |a Assigned SUS document no. 165 in the Susitna Aquatic Impact Assessment Project bibliography. 
504 |a Includes bibliographical references (p. 27). 
530 |a Available also in microfiche format and electronic format on the Internet. 
520 |a "The objective of this study task is to understand slough hydrology under existing, natural conditions and thus provide a methodology by which post-project conditions can be predicted. The study is comprised of four stages: data collection, data interpretation, modeling of existing conditions to understand processes, [and] prediction of post-project conditions."--P. 1. 
505 2 |a Objectives and approach -- Field Data -- Analysis: Groundwater flow ; Thermal analyses ; Coupled thermal and groundwater flow -- Post-project impacts: Types of changes ; Description of Impact ; Watana construction ; Watana impoundment ; Watana operation ; Devil Canyon construction ; Devil Canyon impoundment ; Devil Canyon operation. 
610 2 0 |a Susitna Hydroelectric Project  |x Environmental aspects  |z Alaska  |z Susitna River. 
650 0 |a Watersheds  |x Monitoring  |z Alaska  |z Susitna River Watershed. 
650 0 |a Watershed hydrology  |z Alaska  |z Susitna River Watershed. 
650 0 |a Watershed hydrology  |z Alaska  |z Susitna River Watershed  |x Forecasting. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |z Alaska  |z Susitna River Watershed. 
651 0 |a Susitna River (Alaska)  |x Channels. 
650 0 |a Environmental impact analysis  |z Alaska  |z Susitna River. 
710 2 |a Acres American Incorporated. 
043 |a n-us-ak 
710 2 |a Susitna Hydroelectric Project. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 519. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/5/APA519.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 00519 
098 |a SUS 00165