Draft summary of environmental report, Task 2, Surveys and site facilities /

Saved in:
Bibliographic Details
Alternate Title:Task 2, Surveys and site facilities. Draft summary of environmental report.

Susitna Hydroelectric Project. Draft summary of environmental report, Task 2, Surveys and site facilities. Subtask 2.10, Access road

Alaska Power Authority, Susitna Hydroelectric Project. Draft summary of environmental report, Task 2, Surveys and site facilities
Corporate Contributor(s):Alaska Power Authority. Public Participation Office.

Acres American Incorporated.

Alaska Power Authority.

Susitna Hydroelectric Project.
Publisher:Alaska Power Authority,
Report Numbers:APA 1210

SUS 80
Series:Document (Susitna Hydroelectric Project) ; no. 1210.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Physical Description:8, 28, [3] pages : forms ; 28 cm
Notes:At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

"September 1981"--Cover.

"October 1981."

The final three pages (following p. 28) are numbered 36, 37, and 39.

The second section is a report on workshops and questionnaires and is called: Access report / Alaska Power Authority, Public Participation Office. October 9, 1981. Pages 29-35 and 38 are not included.