Draft summary of environmental report, Task 2, Surveys and site facilities /
Saved in:
Alternate Title: | Task 2, Surveys and site facilities. Draft summary of environmental report. Susitna Hydroelectric Project. Draft summary of environmental report, Task 2, Surveys and site facilities. Subtask 2.10, Access road Alaska Power Authority, Susitna Hydroelectric Project. Draft summary of environmental report, Task 2, Surveys and site facilities |
---|---|
Corporate Contributor(s): | Alaska Power Authority. Public Participation Office. Acres American Incorporated. Alaska Power Authority. Susitna Hydroelectric Project. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1210 SUS 80 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1210. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Physical Description: | 8, 28, [3] pages : forms ; 28 cm |
---|---|
Notes: | At head of title: Alaska Power Authority, Susitna Hydroelectric Project. "September 1981"--Cover. "October 1981." The final three pages (following p. 28) are numbered 36, 37, and 39. The second section is a report on workshops and questionnaires and is called: Access report / Alaska Power Authority, Public Participation Office. October 9, 1981. Pages 29-35 and 38 are not included. |