Environmental and economic aspects of contemporaneous electric transmission line right-of-way management techniques /
This report represents over two years of intensive field analysis of 22 sites in all major forests and physiographic regions in the state of New York.
Saved in:
Additional Author(s): | Holewinski, D. E. Zeigler, A. J. Mayer, Thomas Douglas, 1944- |
---|---|
Corporate Contributor(s): | Asplundh Environmental Services. Empire State Electric Energy Research Corporation. |
Publisher: | Asplundh, |
Report Numbers: | APA 1968 APA 1969 APA 1970 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1968-1970. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | This report represents over two years of intensive field analysis of 22 sites in all major forests and physiographic regions in the state of New York. |
---|---|
Physical Description: | 3 v. : ill., maps (some folded) ; 28 cm. |
Notes: | "Prepared for the Empire State Electric Energy Research Corporation (ESEERCO)." "June 1977." |
Bibliography: | Includes bibliographical references (v. 1, p. 8-1 to 8-5). |