Published: Anchorage : Alaska Energy Authority, 2014.
September 2014.
Assigned SuWa numbers 247 to 253.
SuWa Number | Volume | Study Plan Number(s) | Study Title |
247 | Cover letter | -- |
Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; third set of 2014 technical memoranda for Initial Study Plan meetings. Title from subject line. September 30, 2014 |
248 | Attachment A | 5.5, 5.6 |
Baseline water quality study (Study 5.5) and water quality modeling study (Study 5.6) : water quality and lower river modeling, technical memorandum |
249 | Attachment B | 5.7 |
Mercury assessment and potential for bioaccumulation study (Study 5.7) : evaluation of continued mercury monitoring beyond 2014, technical memorandum "(revised per errata November 14, 2014)" Attachment B was revised in full by Attachment N to SuWa 268 (see pages 3-18 in that document). ARLIS has updated SuWa 249 accordingly. |
250 | Attachment C | 7.5 |
Groundwater study (Study 7.5) : preliminary groundwater and surface-water relationships in lateral aquatic habitats within focus areas FA-128 (Slough 8A) and FA-138 (Gold Creek) in the middle Susitna River, technical memorandum- [Main report]
- Appendix A. Hydrologic stations primary station purpose, location and data collection parameters
- Appendix B. April 2014 discharge measurements
- Appendix C. 2014 groundwater study response analysis time-lapse image data at site ESSFA128-1
|
251 | Attachment D | 7.5 |
Groundwater study (Study 7.5) : groundwater and surface-water relationships in support of riparian vegetation modeling, technical memorandum- [Main report]
- Appendix A. Hydrologic stations primary station purpose, location and data collection parameters
|
252 | Attachment E | 9.7 |
Salmon escapement study (Study 9.7) : 2014 implementation and preliminary results, technical memorandum |
253 | Attachment F | 9.17 |
Cook Inlet beluga whale study plan (Study 9.17) : 2015 implementation plan, technical memorandum |