Published: Anchorage : Alaska Energy Authority, 2014.
September 2014.
Assigned SuWa numbers 239 to 246.
SuWa Number | Volume | Study Plan Number | Study Title |
239 | Cover letter | -- |
Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; second set of 2014 technical memoranda for Initial Study Plan meetings. Title from subject line. September 26, 2014 |
240 | Attachment A | 6.5 |
Geomorphology study (Study 6.5) : updated mapping of aquatic macrohabitat types in the middle Susitna River segment from 1980s and current aerials, technical memorandum
|
241 | Attachment B | 6.5 |
Geomorphology study (Study 6.5) : Mapping of geomorphic features and turnover within the middle and lower Susitna River segments from 1950s, 1980s, and current aerials, technical memorandum
|
242 | Attachment C | 6.6 |
Fluvial geomorphology modeling below Watana Dam study (Study 6.6) : decision point on fluvial geomorphology modeling of the Susitna River below PRM 29.9, technical memorandum |
243 | Attachment D | 6.6 |
Fluvial geomorphology modeling below Watana Dam study (Study 6.6) : winter sampling of main channel bed material, technical memorandum |
244 | Attachment E | 9.17 |
Cook Inlet beluga whale study (Study 9.17) : 2014 Cook Inlet beluga whale prey study implementation, technical memorandum |
245 | Attachment F | 9.8 |
River productivity study (Study 9.8) : 2013 initial river productivity results, technical memorandum |
246 | Attachment G | 9.8 |
River productivity study (Study 9.8) : 2014 field season river productivity progress report, technical memorandum |