Susitna Project status report.

[Washington, D.C.] : Federal Energy Regulatory Commission, [1982-1986]

"Internal management document."

"Federal Energy Regulatory Commission -- data for decisions."


 

LINKS VIA ARLIS DOCUMENT SERVER:

The only issues available electronically at this time are the following issues that were assigned Document numbers in the Susitna Hydroelectric Project document index.   The quality is fair as they were scanned from microfiche.

APA NumberDateSize
3529October 15, 1982 -- Preliminary draft.1.3 MB
3530November 1, 1982 -- Preliminary draft.1.8 MB
3531December 1, 1982 -- Preliminary draft.7.1 MB
3532January 1, 1983 -- Draft.3.4 MB
3533February 1, 19834.2 MB
3534March 1, 19833.6 MB
3535June 1, 19834 MB
3536July 1, 19834.1 MB
3537August 1, 19833.8 MB
3538September 1, 19834.1 MB
3539October 1, 19834.1 MB
3540November 1, 19833.9 MB
3541December 1, 1983

Pages I-4 and I-5 are missing.

3.8 MB
3542January 1, 19844.1 MB
3543February 1, 19844.5 MB
3544March 1, 19847.5 MB
3545April 1, 19847.6 MB
3546June 1, 19846.7 MB
3547July 1, 19847 MB
3548August 1, 198410.1 MB
3549September 1, 198411.7 MB
3550October 1, 19849.9 MB
3551November 1, 19844.1 MB
3552December 1, 19847.3 MB
3553February 1, 198510.4 MB