Draft Susitna hydropower feasibility analysis : environmental assessment.
[Alaska] : Alaska District, U.S. Army Corps of Engineers, [1978]
63, 1 p. ; 27 cm. + 10 maps (each 34 x 49 cm. on sheets 37 x 53 cm.)
Assigned APA Document no. 3294
LINKS VIA ARLIS DOCUMENT SERVER:
Piece | Contents | |
Text | ||
All maps (except maps 6-7 which have a varied title) are called: Southcentral Railbelt area, Alaska : upper Susitna River basin | ||
Figure 1 | [No special title, but has inset "Upper Susitna River profile : river miles 120-290" with location map.] | |
Figure 2 | Proposed transmission corridor. | |
Figure 3 | Watana damsite field camp facilities. | |
Figure 4 | Devil Canyon, field camp facilities. | |
Figure 5 | Proposed access corridor : Denali Highway to Watana damsite. | |
Figure 6 | Climatology and streamgaging stations. | |
Figure 7 | Anemometer stations. | |
Figure 8 | Proposed access route corridor : Chulitna to Devil Canyon damsite to Watana damsite. | |
Figure 9 | Watana damsite borrow site exploration and testing locations. | |
Figure 10 | Land status. |