Draft Susitna hydropower feasibility analysis : environmental assessment.

[Alaska] : Alaska District, U.S. Army Corps of Engineers, [1978]

63, 1 p. ; 27 cm. + 10 maps (each 34 x 49 cm. on sheets 37 x 53 cm.)

Assigned APA Document no. 3294


 

LINKS VIA ARLIS DOCUMENT SERVER:

Piece Contents
Text
All maps (except maps 6-7 which have a varied title) are called:
Southcentral Railbelt area, Alaska : upper Susitna River basin
Figure 1[No special title, but has inset "Upper Susitna River profile : river miles 120-290" with location map.]
Figure 2Proposed transmission corridor.
Figure 3Watana damsite field camp facilities.
Figure 4Devil Canyon, field camp facilities.
Figure 5Proposed access corridor : Denali Highway to Watana damsite.
Figure 6Climatology and streamgaging stations.
Figure 7Anemometer stations.
Figure 8Proposed access route corridor : Chulitna to Devil Canyon damsite to Watana damsite.
Figure 9Watana damsite borrow site exploration and testing locations.
Figure 10Land status.