Final environmental assessment record, Susitna hydropower feasibility study.
Anchorage : U.S. Dept. of the Interior, Bureau of Land Management, [1979]
172 p. in various pagings ; 28 cm. + 7 map plates (34 x 49 cm or 31 x 44 cm.)
"Applicant: Alaska Power Authority."
LINKS VIA ARLIS DOCUMENT SERVER:
APA Number | Piece | Contents | Size |
2956 | Text | Project description -- Existing environmental setting -- Probable environmental impacts -- Recommended mitigating measures -- Residual impacts -- Relationship between short-term use and long-term productivity -- Irreversible and irretrievable commitments of resources -- Consultation and coordination -- Participating staff -- appendix A. Scenic quality inventory -- appendix B. Tabulation of field activities according to season and year of accomplishment -- appendix C. References. | 4.9 MB |
All maps except 4 (which has a varied title) are called: Southcentral Railbelt area, Alaska : upper Susitna River basin | |||
Figure 1 | General location map. | 1.6 MB | |
Figure 2 | Watana Project area. | 5.2 MB | |
Figure 3 | Devil Canyon, project area. | 2.8 MB | |
Figure 4 | Climatology, hydrology & transmission corridors. | 3.9 MB | |
Figure 5 | Proposed access route study corridor : Denali Highway to Watana damsite and approximate winter trail route. | 3.8 MB | |
Figure 6 | Proposed access route study corridor : Chulitna to Devil Canyon damsite to Watana damsite. | 4 MB | |
Figure 7 | Land status | 2.5 MB |