Case E-VI alternative flow regime : report / by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority.

[Anchorage, Alaska] : Alaska Power Authority, [1985]

7 v. : ill., maps ; 28 cm.

Note:   The title used for v. 1-2 does not appear on v. 3-7.   The titles appearing on the title pages and covers of those volumes are distinct.

LINKS VIA ARLIS DOCUMENT SERVER:

APA Number SUS Number Volume Section Size
2600 459

v. 1 Main report4.3 MB
2601 460

v. 2 Appendices A-D
  • Appendix A - Resource agency meeting minutes - November 1984 and December 1984.
  • Appendix B - Resource agency comments on 'Evaluation of alternative flow requirements', (Harza-Ebasco November 1984)
  • Appendix C - Status of license application figures and tables related to Case E-VI.
  • Appendix D - Stream flow time series, Susitna river at Watana and Devil Canyon, (Harza-Ebasco 1985).
2.6 MB
2602 461

v. 3 Appendix E
  • Stream flows and flow duration curves. At Watana, Gold Creek, Sunshine and Susitna Station, for Watana only operation in 1996 and 2001.
18.7 MB
2603 462

v. 4 Appendix F
  • Stream flows and flow duration curves. At Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station, for Watana and Devil Canyon, in 2002 and 2020
21.6 MB
2604 463

v. 5 Appendix G
  • Reservoir/river temperatures and ice simulations for Watana only operating in 2001
4 MB
2605 464

v. 6 Appendix H
  • Reservoir/river temperatures and ice simulations for Watana and Devil Canyon operating in 2002
4.9 MB
2606 465

v. 7 Appendix I
  • Refinements to reservoir and river temperatures and ice simulations for October 1976 to May 1977, mete[o]rologic and hydrologic data
6.7 MB