|
|
|
|
LEADER |
00855cmm a22002773 4500 |
001 |
1470469 |
003 |
SIRSI |
008 |
121010n1979 000 0 eng u |
110 |
1 |
|
|a Michael Baker, Jr., Inc.
|
245 |
0 |
0 |
|a Northwest Alaskan Pipeline Project reconnaissance plans for material site exploration program Yukon River to Delta Junction
|
260 |
|
|
|a Michael Baker, Jr., Inc.
|
518 |
|
|
|a June 1979
|
300 |
|
|
|a 195 p.
|
380 |
|
|
|a Report
|
546 |
|
|
|a English
|
653 |
|
|
|a Site exploration
|
653 |
|
|
|a Design and construction
|
653 |
|
|
|a Engineering
|
653 |
|
|
|a Routing
|
653 |
|
|
|a Corridors
|
610 |
|
|
|a Northwest Alaska Pipeline Project
|
710 |
|
|
|a Fluor Northwest, Inc.
|
690 |
|
|
|a PF-PROJ
|
690 |
|
|
|a PF-CONS
|
856 |
|
|
|u https://www.arlis.org/docs/vol1/AlaskaGas/Report/Report_MB_1979_NWAlaskanPipelineProjectRecon.pdf
|
596 |
|
|
|a 10
|