1
Published [2012]
Report Number(s): SuWa 176
Direct link to this study request.Link to related AEA-prepared Integrated Licensing Process study requests.
2
3
4
Published 2014]
“...Initial Study Report. Study plan Section 10.9, Wolverine distribution, abundance, and habitat...”Report Number(s): SuWa 207
Direct link to this section.List of all draft Initial Study Reports.
5
Published [2015]
“...Study Completion Report. Wolverine distribution, abundance, and habitat occupancy (Study 10.9)...”Report Number(s): SuWa 289
Link to this document.List of related "Study Completion Reports" and "2014-2015 Study Implementation reports" published in October and November 2015 and May 2016.
6
Published [2014-2015]
“...Initial Study Report. Study plan Section 10.9, Wolverine distribution, abundance, and habitat...”Report Number(s): SuWa 223
Direct link to the first part of this document.List of all parts of this document (see Section 10.9). List includes related Initial Study Reports.
7
Published [2013]
“...Final study plan. Wolverine distribution, abundance, and habitat occupancy study 10.9...”Report Number(s): SuWa 200
Direct link to this document.List of related Final Study Plans.
8
by Whitman, Jackson S.,
Published [1983]
“...Susitna Hydroelectric Project. 1982 annual report, big game studies. Volume 7, Wolverine...”Published [1983]
Report Number(s): APA 417
Link to full text
9
by Whitman, Jackson S.,
Published [1984]
“...Susitna Hydroelectric Project. 1983 annual report, big game studies. Volume VII, Wolverine...”Published [1984]
Report Number(s): APA 2326
Link to full text
10
Published [1982]
“...Susitna Hydroelectric Project. Phase I final report, big games studies. Volume 7, Wolverine. Volume...”Report Number(s): APA 416 APA 1335 SUS 116 SUS 117
Link to full text