Susitna Hydroelectric Project. Final Phase I report, big game studies. Volume V, Wolf / Warren B. Ballard, Craig L. Gardner, John H. Westlund, and James R. Dau ; Alaska Department of Fish and Game.

Variant Title:
Additional Author(s):
  • Ballard, Warren B.
  • Gardner, Craig L.,
  • Westlund, John H.,
  • Dau, J.
Corporate Contributor(s):
  • Susitna Hydroelectric Project.
  • Alaska. Department of Fish and Game
  • Alaska Power Authority,
Publisher: [Anchorage, Alaska] : Alaska Department of Fish and Game, [1982]
Report Numbers: APA 412
APA 1333
SUS 114
Physical Description: xv, 220 pages : illustrations, maps ; 28 cm.
Series: Document (Susitna Hydroelectric Project) ; no. 412.
Document (Susitna Hydroelectric Project) ; no. 1333.
Subject - Corporate:
Subject - Topical:
Notes: "Submitted to the Alaska Power Authority."

"March, 1982"--Cover.

Contents:
  • Introduction -- Methodology -- Results and Discussion: Pack histories ; Elevational and seasonal usage of habitat types ; Food habits ; Predation ; Wolf territories, population numbers ; Impacts of wolves on moose and caribou ; Wolf hunting-trapping mortality ; Den sites ; Summer activity patterns -- Potential impacts of Susitna Hydroelectric Project on wolves -- Proposed phase II studies -- appendix A. Comparison and assessment of drugs used to immobilize Alaskan gray wolves (Canis lupus) from a helicopter -- appendix B. Abstract of: Nelchina Basin wolf studies. Volume III, final project report : July 1, 1975 to June 30, 1980 -- appendix C. Use of mandible versus longbone to evaluate percent marrow fat in moose and caribou -- appendix D. Nelchina yearling moose mortality study. Volume II, final report : Mar. 1, 1980 to June 30, 1981 -- appendix E. Daily activity, movements and association of eight members of the Watana wolf pack as determined from aerial observations from 6 May through 1 July 1981 in the Susitna River basin of Southcentral Alaska. (statistical tables).
Online Access: Link to Full Text
Library Holdings – Print Versions

LEADER 04119cam a2200685Ia 4500
001 375851
003 SIRSI
005 20170530022415.0
007 ta
007 he bmu---bbca
007 cr bn||||a||||
008 030714s1982 akuab bst s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d OCLCQ  |d OCLCG  |d RLA  |d OCLCA  |d OCLCQ  |d RLA 
035 |a (OCoLC)52609091 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b B54 no. 412 
088 |a APA 412 
088 |a APA 1333 
088 |a SUS 114 
049 |a RLAA 
245 0 0 |a Susitna Hydroelectric Project.  |p Final Phase I report, big game studies.  |n Volume V,  |p Wolf /  |c Warren B. Ballard, Craig L. Gardner, John H. Westlund, and James R. Dau ; Alaska Department of Fish and Game. 
246 3 |a Susitna Hydroelectric Project.  |p Final Phase 1 report, big games studies.  |n Volume 5,  |p Wolf 
246 3 0 |a Final Phase I report, big games studies.  |n Volume V,  |p Wolf 
246 3 0 |a Big game studies.  |n Volume V,  |p Wolf 
246 3 0 |a Wolf 
246 1 4 |a Susitna Hydroelectric Project.  |p Phase I final report, big games studies.  |n Volume V,  |p Wolf 
246 3 0 |a Phase I final report, big game studies.  |n Volume V,  |p Wolf 
260 |a [Anchorage, Alaska] :  |b Alaska Department of Fish and Game,  |c [1982] 
300 |a xv, 220 pages :  |b illustrations, maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a "Submitted to the Alaska Power Authority." 
500 |a "March, 1982"--Cover. 
510 3 |a Assigned APA Document no. 412 in Susitna Hydroelectric Project document index. Also assigned no. 1333 (duplicate number). 
510 3 |a Assigned number SUS 114 in the Susitna Aquatic Impact Assessment Project bibliography. 
530 |a Available also in microfiche format and electronic format on the Internet. 
505 0 |a Introduction -- Methodology -- Results and Discussion: Pack histories ; Elevational and seasonal usage of habitat types ; Food habits ; Predation ; Wolf territories, population numbers ; Impacts of wolves on moose and caribou ; Wolf hunting-trapping mortality ; Den sites ; Summer activity patterns -- Potential impacts of Susitna Hydroelectric Project on wolves -- Proposed phase II studies -- appendix A. Comparison and assessment of drugs used to immobilize Alaskan gray wolves (Canis lupus) from a helicopter -- appendix B. Abstract of: Nelchina Basin wolf studies. Volume III, final project report : July 1, 1975 to June 30, 1980 -- appendix C. Use of mandible versus longbone to evaluate percent marrow fat in moose and caribou -- appendix D. Nelchina yearling moose mortality study. Volume II, final report : Mar. 1, 1980 to June 30, 1981 -- appendix E. Daily activity, movements and association of eight members of the Watana wolf pack as determined from aerial observations from 6 May through 1 July 1981 in the Susitna River basin of Southcentral Alaska. (statistical tables). 
504 |a Includes bibliographical references. 
650 0 |a Wolves  |x Effect of dams on  |z Alaska  |z Susitna River Watershed. 
650 0 |a Wolves  |x Habitat  |z Alaska  |z Susitna River Watershed. 
650 0 |a Wolves  |x Migration  |z Alaska  |z Susitna River Watershed  |v Statistics. 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |z Alaska  |z Susitna River Watershed. 
650 0 |a Dams  |x Environmental aspects  |z Alaska  |z Susitna River Watershed. 
700 1 |a Ballard, Warren B.  |e author. 
700 1 |a Gardner, Craig L.,  |e author. 
700 1 |a Westlund, John H.,  |e author. 
700 1 |a Dau, J.  |q (Jim),  |e author. 
710 2 |a Susitna Hydroelectric Project. 
710 1 |a Alaska.  |b Department of Fish and Game  |e issuing body. 
710 2 |a Alaska Power Authority,  |e commissioning body. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 412. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1333. 
856 4 1 |u http://www.arlis.org/docs/vol1/Susitna/4/APA412.pdf  |z ARLIS Document Server 
901 |a 3755  |f orig 
098 |a APA 00412 
098 |a SUS 00114 
098 |a APA 01333 
596 |a 9 10