Surveys of eagles and other raptors, Study plan Section 10.14, Initial Study Report /

The proposed Susitna-Watana Hydroelectric Project in Alaska may affect raptor species. In order to predict and quantify effects that may result, this study is being conducted to characterize population size, productivity, nesting phenology, habitat use, and migratory movements of raptors. The study...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 10.14, Surveys of eagles and other raptors.

Initial Study Report. Surveys of eagles and other raptors (10.14)

Surveys of eagles and other raptors, Study plan Section 10.14, 2014 Study Implementation Report.
Corporate Contributor(s):Alaska Energy Authority,

ABR, Inc.

Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Original Source:Succeeded by (expression): Surveys of eagles and other raptors, Study plan Section 10.14, 2014 Study Implementation Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:The proposed Susitna-Watana Hydroelectric Project in Alaska may affect raptor species. In order to predict and quantify effects that may result, this study is being conducted to characterize population size, productivity, nesting phenology, habitat use, and migratory movements of raptors. The study will also provide information required for a possible application(s) for federal eagle take and/or eagle nest take permits. Through the use of aerial surveys, all raptors are studied with a focus on bald and golden eagles. The raptor study area includes a buffer zone around the proposed reservoir and road, rail, and transmission line corridors (including the Denali corridor linked to the Denali Highway and westward to Cantwell). This document details Alaska Energy Authority's status in implementing the study as set forth in the FERC-approved Revised study plan.
Physical Description:108 pages in various pagings : color maps, charts ; 28 cm.
Notes:"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"Prepared for Alaska Energy Authority."

Parts A, B, and C are dated: June 2014.

Part D is dated: November 2015.

ARLIS assigned report number: SuWa 223.
Report Type:Initial Study Report.
Original Source:Succeeded by (expression): Surveys of eagles and other raptors, Study plan Section 10.14, 2014 Study Implementation Report.
Bibliography:Includes bibliographical references (Part A, pages 30-34).
Related Items:Succeeded by: Surveys of eagles and other raptors, Study plan Section 10.14, 2014 Study Implementation Report / prepared by ABR, Inc. - Environmental Research & Services, [Office in] Fairbanks, Alaska. -- November 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289).