Projected traffic volumes on the project access roads : conversation in regard to Wildlife issue paper W-10.

A very brief report on estimated traffic flow on access routes to the Susitna Hydroelectric Project site during construction. This conversation is in regard to the position paper called "Wildlife issue W-10", Significance of access road presence and use effects on caribou movements and beh...

Full description

Saved in:
Bibliographic Details
Alternate Title:At head of report: Personal communication report

Significance of access road presence and use effects on caribou movements and behavior.
Main Author: Elliott, Charles Lawrence,
Additional Author(s):Craddock, Charles D.,
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.
Report Numbers:APA 2011
Original Source:Significance of access road presence and use effects on caribou movements and behavior.
Series:Document (Susitna Hydroelectric Project) ; no. 2011.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02549ctm a2200517Ia 4500
001 2028287
003 SIRSI
005 20140819123306.0
007 ta
007 cr bn||a||||||
008 140328s1984 xx t 000 0 eng d
040 |a RLA  |c RLA  |d RLA  |d OCLCO  |d RLA 
035 |a (OCoLC)875016817 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 2011 
088 |a APA 2011 
100 1 |a Elliott, Charles Lawrence,  |e author,  |e interviewer. 
245 1 0 |a Projected traffic volumes on the project access roads :  |b conversation in regard to Wildlife issue paper W-10. 
246 1 |i At head of report:  |a Personal communication report 
260 |c [1984] 
300 |a 1 p. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 2011 
500 |a Title from subject line. 
500 |a "Person contacted, Charles D. Craddock, Engineering Operations Manager, Harza-Ebasco Susitna Joint Venture ... Anchorage, AK ; Contacted by, Charles Elliott ; Date 9-84." 
500 |a Header of form: Harza-Ebasco Susitna Joint Venture. 
500 |a Facsimile made for Susitna Hydroelectric Project. Series statement from label on cover. 
510 3 |a Assigned APA Document no. 2011 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
520 |a A very brief report on estimated traffic flow on access routes to the Susitna Hydroelectric Project site during construction. This conversation is in regard to the position paper called "Wildlife issue W-10", Significance of access road presence and use effects on caribou movements and behavior. 
650 0 |a Traffic flow  |z Alaska  |z Susitna River Region. 
650 0 |a Traffic estimation  |z Alaska  |z Susitna River Region. 
650 0 |a Construction projects  |z Alaska  |z Susitna River Region. 
610 2 0 |a Susitna Hydroelectric Project. 
650 4 |a Dams  |x Access roads  |z Alaska  |z Susitna River Region. 
650 4 |a Access roads  |z Alaska  |z Susitna River Region. 
700 1 |a Craddock, Charles D.,  |e interviewee. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
730 0 |a Significance of access road presence and use effects on caribou movements and behavior. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 2011. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/20/APA2011.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 02011