Refinement to reservoir and river temperature and ice studies for simulation period October 1976 to May 1977. transmitted to the Federal Energy Regulatory Commission on November 2, 1984. Text changes and new exhibits G and N for Instream ice simulation study by Harza-Ebasco for Alaska Power Authority :

This document comprises errata to the main text (that is, "Report" section) and replacements to two exhibits of the document: Instream ice simulation study. Final report. (Assigned numbers APA 1986 and SUS 434.)

Saved in:
Bibliographic Details
Alternate Title:Appendix - I
Corporate Contributor(s):Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.

United States. Federal Energy Regulatory Commission.
Publisher:[Harza-Ebasco],
Report Numbers:SUS 491
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This document comprises errata to the main text (that is, "Report" section) and replacements to two exhibits of the document: Instream ice simulation study. Final report. (Assigned numbers APA 1986 and SUS 434.)
Physical Description:1 v. : ill. ; 28 cm.
Notes:Cataloging based on copy missing attached replacement for Exhibit N. This exhibit was not microfilmed and is apparently lost.

At head of title: Appendix - I. (This implies this correction document is considered an appendix to the document numbered APA 1986.)

"42164312."

"850204" (probably a date).
Supplement of:Corrections to: Instream ice simulation study. [Final]. [Anchorage, Alaska] : Alaska Power Authority, [1984] APA 1986 SUS 434