Draft Susitna hydropower feasibility analysis : environmental assessment.

"The function of this environmental assessment is to conduct a systematic and analytical assessment of the environmental impacts, including ways to minimize adverse impacts, related to the field activities of the project feasibility analysis as detailed in the June 1978 'Plan of Study for...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna hydropower feasibility analysis : environmental assessment
Corporate Contributor(s):United States. Army. Corps of Engineers. Alaska District.
Publisher:Alaska District, U.S. Army Corps of Engineers,
Report Numbers:APA 3294
Series:Document (Susitna Hydroelectric Project) ; no. 3294.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:"The function of this environmental assessment is to conduct a systematic and analytical assessment of the environmental impacts, including ways to minimize adverse impacts, related to the field activities of the project feasibility analysis as detailed in the June 1978 'Plan of Study for Susitna Feasibility Analysis.' This project feasibility will consist of engineering, economic, social, and biological studies which are considered necessary to establish the feasibility of developing the upper Susitna hydropower potential."--Page [1].
Physical Description:63, 1 pages ; 27 cm + 10 maps (each 34 x 49 cm, on sheets 37 x 53 cm).
Notes:Cover title.

"December 1978."