Task 2, Surveys and site facilities. Subtask 2.12, Field reconnaissance reservoir area. Timber report, final /

"The purpose of this portion of Subtask 2.12 is to gain an understanding of the effort that will be required in clearing both the Devil Canyon and Watana reservoirs of vegetation prior to their inundation. The focus of attention has been on the nature of the vegetative cover, primarily forested...

Full description

Saved in:
Bibliographic Details
Alternate Title:Field reconnaissance reservoir area

Alaska Power Authority, Susitna Hydroelectric Project. Field reconnaissance reservoir area. Timber report

Subtask 2.12, Field reconnaissance reservoir area

Surveys and site facilities

Alaska Power Authority, Susitna Hydroelectric Project. Task 2, Surveys and site facilities. Subtask 2.12, Field reconnaissance reservoir area. Timber report, final
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 1213
Edition:Final.
Series:Document (Susitna Hydroelectric Project) ; no. 1213.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:"The purpose of this portion of Subtask 2.12 is to gain an understanding of the effort that will be required in clearing both the Devil Canyon and Watana reservoirs of vegetation prior to their inundation. The focus of attention has been on the nature of the vegetative cover, primarily forested, to include a description of the size, volume, stocking level and other stand characteristics within both of the reservoir basins (at maximum operating level)."--P. 1-1.
Physical Description:16 p. in various pagings : 1 map ; 28 cm.
Notes:Cover title.

At head of cover title: Alaska Power Authority, Susitna Hydroelectric Project.

"March 1982"--Cover.

Assigned document no. 1213 in Susitna Hydroelectric Project document index.

"March 1982."
Report Type:Final report.
Bibliography:Includes bibliographical references (p. 1-2).