Task 11.03, Close-out report, Susitna risk analysis / prepared by Acres.

Variant Title:
Corporate Contributor(s):
  • Acres American Incorporated.
  • Alaska Power Authority.
  • Susitna Hydroelectric Project.
Publisher: [Anchorage, Alaska] : Alaska Power Authority, [1982]
Report Numbers: APA 300
APA 1369
Physical Description: 155 leaves in various foliations : ill., charts ; 28 cm.
Series: Document (Susitna Hydroelectric Project) ; no. 300.
Document (Susitna Hydroelectric Project) ; no. 1369.
Subject - Corporate:
Subject - Topical:
Subject - Geographic:
Summary: Acres produced this report as part of a feasibility study in preparation for a license application for the Susitna Hydroelectric Project in Alaska. This report provides the details of the methodology, evaluation, analysis, and assessment of the risks associated with (1) the construction capital costs and schedule of the Watana site and Devil Canyon site developments, and (2) the operational outages of the Susitna transmission system. The purpose of this risk analysis is to identify all relevant risks which could affect costs, schedule, safety and public confidence of the project.

Contained Titles:
Notes: At head of title: Susitna Hydroelectric Project, Task 11.

"April 1982."

Series statement from label on cover of some copies.

Contents:
  • Introduction and background -- Summary and conclusions -- Risk analysis methodology -- Technical evaluation -- Formal risk analysis -- Risk assessment and interpretation -- appendix A. Transmission line risk response.
Online Access: Link to Full Text
Library Holdings – Print Versions

LEADER 03295cam a2200613Ia 4500
001 1508764
003 SIRSI
005 20141106173456.0
007 ta
007 cr*bn||a||||||
008 821006s1982 akuad bt s000 0 eng d
040 |a Ak  |c ALK  |d RLA  |d OCLCF  |d RLA 
035 |a (OCoLC)41707147 
043 |a n-us-ak 
050 4 |a TK1425.S9  |b S95 no. 11.03 
050 4 |a TK1425.S8  |b A23 no. 300 
088 |a APA 300 
088 |a APA 1369 
245 0 0 |a Task 11.03, Close-out report, Susitna risk analysis /  |c prepared by Acres. 
246 3 0 |a Close-out report, Susitna risk analysis 
246 3 |a Susitna Hydroelectric Project.  |n Task 11.  |n Task 11.03,  |p Close-out report, Susitna risk analysis 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1982] 
300 |a 155 leaves in various foliations :  |b ill., charts ;  |c 28 cm. 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 300 (or 1369) 
500 |a At head of title: Susitna Hydroelectric Project, Task 11. 
500 |a "April 1982." 
500 |a Series statement from label on cover of some copies. 
510 3 |a Assigned APA Document no. 300 in the Susitna Hydroelectric Project document index. Also assigned no. 1369 (duplicate entry). 
530 |a Available also in electronic format on the Internet. 
520 |a Acres produced this report as part of a feasibility study in preparation for a license application for the Susitna Hydroelectric Project in Alaska. This report provides the details of the methodology, evaluation, analysis, and assessment of the risks associated with (1) the construction capital costs and schedule of the Watana site and Devil Canyon site developments, and (2) the operational outages of the Susitna transmission system. The purpose of this risk analysis is to identify all relevant risks which could affect costs, schedule, safety and public confidence of the project. 
505 0 |a Introduction and background -- Summary and conclusions -- Risk analysis methodology -- Technical evaluation -- Formal risk analysis -- Risk assessment and interpretation -- appendix A. Transmission line risk response. 
504 |a Includes bibliographical references (last page of section 4). 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Dams  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River. 
650 0 |a Risk assessment. 
610 2 7 |a Susitna Hydroelectric Project.  |2 fast  |0 (OCoLC)fst00592845 
650 7 |a Hydroelectric power plants.  |2 fast  |0 (OCoLC)fst00964930 
651 7 |a Alaska.  |2 fast  |0 (OCoLC)fst01204480 
710 2 |a Acres American Incorporated. 
710 2 |a Alaska Power Authority. 
710 2 |a Susitna Hydroelectric Project. 
740 0 |a Susitna Hydroelectric Project, task 11. task 11.03, Close-out report, Susitna risk analysis. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 300. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1369. 
856 4 1 |u http://www.arlis.org/docs/vol1/Susitna/3/APA300.pdf  |z ARLIS Document Server 
901 |a ARLIS  |c arlis 201411 
336 |a text  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
977 |a o41707147 
596 |a 9 10 23 
098 |a APA 00300 
098 |a APA 01369