Survey of experience in operating hydroelectric projects in cold regions / prepared by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority.

Variant Title:
Corporate Contributor(s):
  • Susitna Hydroelectric Project.
  • Alaska Power Authority.
  • HARZA-EBASCO Susitna Joint Venture.
Edition: [Draft].
Publisher: [Anchorage, Alaska] : Alaska Power Authority, [1985]
Report Numbers: SUS 486
SUS 487
SUS 488
SUS 489
Physical Description: 4 volumes : illustrations, maps, forms ; 28 cm
Subject - Corporate:
Subject - Topical:
Summary: A literature review, mailed survey, and site visit have been made to evaluate the procedures adopted by operators of hydroelectric projects in cold regions similar to the Susitna Hydroelectric Project site in response to environmental concerns. Topics that are addressed include reservoir and powerhouse operations to mitigate ice jam related flooding, effects of reservoir ice cover and bank ice on animal crossing, management of reservoir ice cover to control cracking and associated danger to animals, and bank erosion from reservoir and river ice movement.

Notes: At head of title: Susitna Hydroelectric Project.

"April 1985."

Report Type: Draft report.

Contents:
  • v. 1. Main text ; Appendix A & Appendix B. (SUS 486) -- v. 2. Appendix C : Responses to questionnaire. (SUS 487) -- v. 3. Appendix D : Supplemental material included in responses. (SUS 488) -- v. 4. Apendix E : Field memorandum of visit by H.W. Coleman, British Columbia Hydro (Vancouver) and Peace River Town and supplementary material. (SUS 489).
Online Access: Direct link to the first volume (Main text ; Appendix A & Appendix B).
List of all volumes.
Library Holdings – Print Versions

LEADER 03328cam a2200601Ia 4500
001 1479580
003 SIRSI
005 20160505125102.0
007 ta
007 he bmu---bbaa
007 cr bn||||a||||
008 121220s1985 akuabk bt s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d RLA  |d OCLCQ  |d RLA 
035 |a (OCoLC)822263420 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S9 no. 486-489 
088 |a SUS 486 
088 |a SUS 487 
088 |a SUS 488 
088 |a SUS 489 
049 |a RLAA 
245 0 0 |a Survey of experience in operating hydroelectric projects in cold regions /  |c prepared by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. 
246 3 |a Susitna Hydroelectric Project.  |p Survey of experience in operating hydroelectric projects in cold regions 
250 |a [Draft]. 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1985] 
300 |a 4 volumes :  |b illustrations, maps, forms ;  |c 28 cm 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a At head of title: Susitna Hydroelectric Project. 
513 |a Draft report. 
500 |a "April 1985." 
510 3 |a Assigned numbers SUS 486-489 in the Susitna Aquatic Impact Assessment Project bibliography. 
530 |a Available also in microfiche format and electronic format on the Internet. 
504 |a Includes bibliographical references. 
520 |a A literature review, mailed survey, and site visit have been made to evaluate the procedures adopted by operators of hydroelectric projects in cold regions similar to the Susitna Hydroelectric Project site in response to environmental concerns. Topics that are addressed include reservoir and powerhouse operations to mitigate ice jam related flooding, effects of reservoir ice cover and bank ice on animal crossing, management of reservoir ice cover to control cracking and associated danger to animals, and bank erosion from reservoir and river ice movement. 
505 0 |a v. 1. Main text ; Appendix A & Appendix B. (SUS 486) -- v. 2. Appendix C : Responses to questionnaire. (SUS 487) -- v. 3. Appendix D : Supplemental material included in responses. (SUS 488) -- v. 4. Apendix E : Field memorandum of visit by H.W. Coleman, British Columbia Hydro (Vancouver) and Peace River Town and supplementary material. (SUS 489). 
650 0 |a Hydroelectric power plants  |x Cold weather conditions. 
650 0 |a Reservoirs  |x Cold weather conditions. 
650 0 |a Industrial surveys. 
650 0 |a Mail surveys. 
610 2 0 |a Susitna Hydroelectric Project. 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a Alaska Power Authority. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
856 4 1 |u http://www.arlis.org/docs/vol1/Susitna/SUS/4/SUS486.pdf  |x This URL for the first volume is needed for the image to display in the OPAC.  |3 Direct link to the first volume (Main text ; Appendix A & Appendix B).  |z ARLIS Document Server 
856 4 1 |u http://www.arlis.org/docs/vol1/Susitna/SUS/4/SUS486.html  |3 List of all volumes.  |z ARLIS Document Server 
901 |a ARLIS  |h Many pages of v. 4 are very poor (is there a better copy somewhere?) 
596 |a 9 10 
098 |a SUS 00486 
098 |a SUS 00487 
098 |a SUS 00488 
098 |a SUS 00489