Susitna Hydroelectric Project conceptual alternatives design report / prepared by HDR Alaska, Inc. ; prepared for Alaska Energy Authority.

Corporate Contributor(s):
  • HDR Alaska, Inc.
  • Susitna-Watana Hydroelectric Project.
  • Alaska Energy Authority.
Edition: [2009 version].
Publisher: [Anchorage] : [Alaska Energy Authority], [2009]
Report Numbers: SuWa 198
Physical Description: 264 p. in various pagings : col. ill ; 28 cm.
Series: Susitna-Watana Hydroelectric Project document ; no. 198.
Subject - Corporate:
Subject - Topical:
Subject - Geographic:
Notes: "November 23, 2009."

ARLIS assigned report number: SuWa 198.

This report is based on a PDF file dated November 2009. This version contains appendices A-D as given on the table of contents. Another version of this report was created in 2010 with identical title page and chapters (with paging altered by the addition of two blank pages), but with only the appendix title pages for the original appendices A-D and with the inclusion of new appendices B-G.

Report Type: Final draft.

Contents:
  • Executive summary -- Background -- Preliminary energy estimate -- Estimates of probable project development costs -- Project development schedule -- Project development issues -- References -- appendix A. Energy analysis input and results -- appendix B. Detailed cost estimates -- appendix C. Detailed schedules -- appendix D. Climate change analyses.
Online Access: Link to Full Text
Library Holdings – Print Versions

LEADER 02455cam a2200469Ia 4500
001 1288624
003 SIRSI
005 20130930025327.0
007 cr cn||||a||||
008 100225s2009 akua bt s000 0 eng d
035 |a (OCoLC)528874087 
040 |a RLA  |c RLA  |d RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b S92 no. 198 
088 |a SuWa 198 
245 0 0 |a Susitna Hydroelectric Project conceptual alternatives design report /  |c prepared by HDR Alaska, Inc. ; prepared for Alaska Energy Authority. 
250 |a [2009 version]. 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2009] 
300 |a 264 p. in various pagings :  |b col. ill ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 198 
513 |a Final draft. 
500 |a "November 23, 2009." 
500 |a ARLIS assigned report number: SuWa 198. 
500 |a This report is based on a PDF file dated November 2009. This version contains appendices A-D as given on the table of contents. Another version of this report was created in 2010 with identical title page and chapters (with paging altered by the addition of two blank pages), but with only the appendix title pages for the original appendices A-D and with the inclusion of new appendices B-G. 
530 |a Available also in electronic format on the Internet. 
505 0 |a Executive summary -- Background -- Preliminary energy estimate -- Estimates of probable project development costs -- Project development schedule -- Project development issues -- References -- appendix A. Energy analysis input and results -- appendix B. Detailed cost estimates -- appendix C. Detailed schedules -- appendix D. Climate change analyses. 
504 |a Includes bibliographical references (p. 23-24). 
610 2 0 |a Susitna-Watana Hydroelectric Project. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Planning. 
651 0 |a Susitna River (Alaska)  |x Power utilization  |x Planning. 
710 2 |a HDR Alaska, Inc. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a Alaska Energy Authority. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 198. 
043 |a n-us-ak 
856 4 1 |u http://www.arlis.org/docs/vol1/Susitna2/1/SuWa198.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a SuWa 00198